BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bridgewater, New Jersey. Completed plans call for site work for a water / sewer project.

Project Description: The Project consists of stream bank restoration along the Chambers Brook Tributary, West Branch Middle Brook Tributary, & East Branch Middle Brook Tributary, including clearing site, excavation of the excess sediment from the stream channels, restoration of the stream bank with stone filled gabion baskets, riparian zone landscaping plantings, and topsoiling, seeding and mulching. All work on this contract must be completed within sixty (60) calendar days from issuance of a Notice to Proceed Bidder shall submit with the bid a certificated check, cashier's check or bid bond in the amount of ten percent (10%) of the total price bid The successful Bidder shall be prepared to deliver to the OWNER a performance bond for the project to guarantee the completion of the work for a period not less than two (2) year beyond after the date when final payment is due. Said performance bond is to be in an amount of at least 100% of the initial contract amount. The successful Bidder shall be prepared to deliver to the OWNER a payment bond for the project to guarantee the payment of the contractor's obligations for wages and materials supplied to the project location for a period not less than two (2) year beyond after the date when final payment is due. Said payment bond is to be in an amount of at least 100% of the initial contract amount. The successful bidder shall with the delivery of the performance bond submit an executed payment bond to guarantee payment to laborers and suppliers for the labor and material used in the work performed under the contract. The Township of Bridgewater reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. The successful Bidder shall be prepared to deliver to the OWNER a maintenance bond for the project to guarantee the replacement of defective work or materials for a period of two (2) year after the acceptance of the work by the OWNER. Said maintenance bond is to be in an amount of at least 15% of the final contract amount.

Bid Results

Water / Sewer

$585,651.00

Public - City

Site Work

15

12

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
290
Bidding Soon
4,379
All Active Projects
1,983
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Bridgewater, NJ

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.