BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a multi-residential development in Worcester, Massachusetts. Completed plans call for the renovation of a multi-residential development.

The Work under the Contract consists of in general but not limited to 1. This project includes the refurbishment of two (2) existing traction passenger elevators located in the Murray Avenue Apartments, 50 Murray Avenue, Worcester, MA. This work is expected to include replacement of the elevator machinery and upgrades to elevator controls. 2. All work either shown on the Drawings or included in the specifications unless specifically indicated as not to be done. 3. All existing materials and debris shall be removed and disposed of in accordance with all applicable State, Federal and Local Codes and Regulations. The goal for minority participation is 1.6%, trade by trade, of the workforce. The goal for the participation of women is 6.9%, trade by trade, of the workforce. This project includes the re-placement of elevator machinery, elevator cab, elevator controls, and modernization of associated electrical and HVAC infrastructure serving the machine room, shaft and elevator system Bid Results : Elevators : Worcester Elevator Co., Inc - $754,960.00 Heating, Ventilating and AirConditioning (HVAC) :Araujo Bros Plumbing & Heating, Inc - $69,700.00 Electrical :M. L. Schmitt, Inc. - $98,000.00

Award

Multi-Residential

$1,210,879.00

Public - City

Renovation

16

16

15

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
314
Bidding Soon
4,941
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2023

August 21, 2023

Project location map

50 Murray Ave, Worcester, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.