BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Randolph Air Force Base, Texas. Completed plans call for site work for a transportation facility.

Remove rubber & repaint pavement markings on each end of the East & West Runways at JBSA-Randolph. Sept. 2023, Remove rubber & repaint pavement markings on the east runway , (100-ft. wide x 1,500- ft. long x2 ends) and 10-ft each side of the center line (5,400-ft. x 20'), ~410,000-sqft. Also remove rubber & repaint pavement markings on each end of west runway ( 100-ft. wide x 1,500-ft. long x 2 ends) & 10-ft each side of the center line, (5,400-ft. x 20'), ~ 410,000-sqft. March 2024,Remove rubber and repaint pavement markings on the north end of the east runway (100-ft wide x 1,500-ft long x 1 end) and 10-ft each side of the center line (6,900-ft x 20'), ~290,000-sqft. Also, remove rubber and repaint pavement markings on the north end of the west runway (100-ft wide x 1,500-ft long x 1 end) and 10-ft each side of the center line (6,900-ft x 20'), ~290,000-sqft. Repair any damaged joint seal from rubber removal, replace the concrete and concrete-to-asphalt joint seals on the east and west runway up to the hold lines, not including overruns. Use fuel and blast resistant sealant end of the runway, and warmup or holding pads.Remove rubber & repaint pavement markings on each end of the East & West Runways at JBSA-Randolph. Sept. 2023, Remove rubber & repaint pavement markings on the east runway , (100-ft. wide x 1,500- ft. long x2 ends) and 10-ft each side of the center line (5,400-ft. x 20'), ~410,000-sqft. Also remove rubber & repaint pavement markings on each end of west runway ( 100-ft. wide x 1,500-ft. long x 2 ends) & 10-ft each side of the center line, (5,400-ft. x 20'), ~ 410,000-sqft. March 2024,Remove rubber and repaint pavement markings on the north end of the east runway (100-ft wide x 1,500-ft long x 1 end) and 10-ft each side of the center line (6,900-ft x 20'), ~290,000-sqft. Also, remove rubber and repaint pavement markings on the north end of the west runway (100-ft wide x 1,500-ft long x 1 end) and 10-ft each side of the center line (6,900-ft x 20'), ~290,000-sqft. Repair any damaged joint seal from rubber removal, replace the concrete and concrete-to-asphalt joint seals on the east and west runway up to the hold lines, not including overruns. Use fuel and blast resistant sealant end of the runway, and warmup or holding pads. Points of Contact: All questions and communication pertaining to this TOPR should be addressed to, both, the following individuals, unless communicated otherwise: BRYAN YBARBO TONYA BOWLES Contract Specialist (CS) Contracting Officer (CO) bryan.ybarbo.1@us.af.mil tonya.bowles@us.af.mil Technical Questions/RFIs: Questions generated by this TOPR and/or the site visit shall be submitted using the Questions/RFIs & Answers (Q&A) template (Attachment 7). Questions/RFIs are due NLT Tuesday, 30 May 2023, at 10:00 AM (CT) and shall be sent via email to, both, the CS and CO. Between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$500,000.00

Public - Federal

Site Work

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
26
Bidding Soon
2,127
All Active Projects
802
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

July 14, 2023

img_map_placeholder

1 Harmon Dr, Randolph Air Force Base, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.