BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Westport, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposal consists upgrading an existing gravel parking area along Yearout Drive in Westport, WA to a commercial gear yard. Work includes clearing and grubbing; grading of site and pavement of asphalt roadway, installing power distribution and telemetry systems for site access control, security, and lighting; lowimpact stormwater facilities and security fencing. Contractor will provide all labor, materials, and equipment necessary to complete the work as specified. Award will take into consideration the lowest total base bid price to provide the services specified along with qualifications and experience of the bidder and the Ports budget capability All bid proposals shall be accompanied by deposit in cash, certified check, cashiers check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful Bidder fail to enter into a contract and furnish a satisfactory performance bond, the bid proposal deposit shall be forfeited

Award

Water / Sewer

$540,000.00

Public - Federal

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
25
Bidding Soon
389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

September 23, 2023

Project location map

Yearout Dr, Westport, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.