Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 4, 2026
Site work and new construction of a water / sewer project in Westport, Washington. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The project will consist of upgrading two wastewater pump stations in Westport, Washington. The work at Pump Station 4 will include rehabilitation and revisions to the existing wet well, installation of new submersible pumps, a new valve vault, and a new saddle manhole. The work at Pump Station 5 will include modification of the existing wet well to serve as an influent manhole, as well as installation of a new wet well with new submersible pumps and a new valve vault. Pump Station 5 work will also require installation of a new 12-inch gravity sewer line between the new wet well and the influent manhole, and a 12-inch culvert to allow storm drainage in the existing drainage ditch located at the entrance to the new pump station. The work at both pump stations also includes performing all associated piping, electrical, and instrumentation work, as well as bypass pumping and other temporary measures required for construction. ESTIMATE $1,900,000 The Work shall be substantially complete within 180working days after the commencement date stated in the Notice to Proceed. The Work shall be substantially complete within 180working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Westport, Washington. Contract questions shall be directed only to the office of the Project Engineer. A Prebid Conference is scheduled for Thursday, December 18, 2025. The conference will begin at the City Hall, 801 North Montesano Street, Westport, Washington at 2:00p.m. (local time). All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the City of Westport and in an amount of not less than five percent (5%) of the total Proposal amount. The City of Westport expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. All work performed on this project will be subject to Washington State prevailing wage rates. The City of Westport is an equal opportunity employer. All work performed on this project will be subject to Washington State prevailing wage rates. The City of Westport is an equal opportunity employer. All PWB requirements and provisions must be met by general contractors and all subcontractors.
Award
Water / Sewer
$2,172,555.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
