BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a civil project in Clay, West Virginia. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Project includes the following Work: Contract No. 1: consists of modifications to the existing wastewater treatment facility including replacement of existing mechanical screen, screen channel, controls, conversion of existing concrete package plant basins to batch reactor treatment technology, aerobic digester modifications, new blowers, controls, new precast concrete chlorine contact basin, modifications to existing chlorine contact tank, new chlorination dechlorination equipment, new submersible effluent pump station, modifications to existing plant pump station, modifications to existing lab ffice building, new sludge dewatering system, electrical modifications, piping modifications, site work, demolition, new emergency generator, pumps, controls, flow meters, automatic samplers, telemetry, and all other appurtenances shown on the plans and r detailed in the specifications that are necessary for a complete and operable wastewater treatment system upgrade; modifications to Lift Station No. 1, Lift Station No. 2, Lift Station No. 3, Lift Station No. 4, and Lift Station No. 7, 1100 LF of 10" Restrained Joint PVC installed by pipe bursting (including all surface restoration & bypass pumping), Reconnection of 13 existing laterals to new 10" PVC gravity sewer, Replacement of 4 existing 4' Diameter Precast Manholes including Cast Iron Watertight rings and covers, purchase of a 1 1/2 Ton Four Wheel Drive Dump Truck, a Trailer mounted sewer jetter, a Trailer mounted sewer vacuum, Mobilization Demobilization, Preconstruction Video, 2 Field Offices, a Site Sign, and 50 Tons of Special Fill Material; Work shall also include erosion control, temporary pumping and controls to maintain the facilities in an uninterrupted serviceable condition and all other required appurtenances, materials and equipment required for a complete and operable wastewater collection and treatment system. Bids shall be accompanied by a certified check or bid bond payable to the Town of Clay in an amount equal to five percent (5%) of the base bid. The Town of Clay reserves the right to reject any and all bids. Question Deadline 07/19/2023 at 1:00 PM ET

Award

Water / Sewer

$8,869,000.00

Public - City

Demolition, Site Work

69

33

28

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
40
Bidding Soon
343
All Active Projects
138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

October 2, 2023

img_map_placeholder

To Be Determined, Clay, WV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.