BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2023 at 8:00 PM

Updated November 15, 2023

New construction and renovation of a clubhouse / community center in Headingley, Manitoba. Completed plans call for the renovation of a clubhouse / community center; for the construction of a clubhouse / community center; and 12,000-square-foot clubhouse / community center.

Reference Number 0000250095 Question Acceptance Deadline 2023/06/30 05:00:00 PM CDT To establish a contractual relationship between the RM of Headingley and a qualified Design-Build team for the design and construction related to the proposed expansion to the Headingley Community Centre. The successful proponent will be responsible from concept to working drawings and design, through the sub-contracting and construction process, for a turn-key solution for the project described herein. The RM of Headingley is looking for a Leed Silver building design, this building must comply with the Manitoba Engergy Code for Buildings. The RM of Headingley is contemplating a 12,000 square foot expansion of our community centre by adding a gymnasium, fitness and community spaces at 5353 Portage Avenue. The RM of Headingley has budgeted $4.5 million for this expansion project. The RM of Headingley has considered the expansion of the existing community centre over the last few years. Council envisioned the centre expanding by incorporating the following features: construction of an 8,500 square foot gym, 2,000 square foot fitness centre, and 1,500 square feet of multipurpose room(s) all to LEED Silver standards, as well as meeting current accessibility standards. Assessing the existing facility for user flow and design efficiencies shall be considered as part of this expansion project. The project is to be funded by various grants and municipal reserves. Headingley Council appreciated the work done by various user groups such as Macdonald-Headingley Recreation District (MHRD), Phoenix Recreation Group, Stantec Architectural Ltd and considered their recommendations as part of the RFP package. The RM of Headingley would like to see construction substantially completed and ready for occupancy by October 30, 2024. However, if you are unable to meet this date, please specify your proposed timeline. Official bid documents must be obtained from www.merx.com

Award

Clubhouse / Community Centers

$4,500,000.00

Public - County

New Construction, Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
46
Bidding Soon
550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

January 8, 2024

Project location map

5353 Portage Ave, Headingley, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.