BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Brookline, Vermont. Completed plans call for site work for a bridge / tunnel.

The Town is seeking bids for replacement and remediation of four (4) culverts and related roadway repairs. These Town culverts numbered 9, 10, 28 and 31, all located on Putney Mountain road, require the following work: o Culvert 9: Excavation and installation of two 36 inch by 20 foot long plastic culverts. (Total combined length 40 feet.) Excavation of ledge material will be necessary for this culvert replacement which will require both a hydraulic hammer and an excavator. One or two Ash trees will require removal to improve water flow to the inlet of the new culvert. The Town will supply the culverts. Installation of a concrete header is required on the new culvert inlet. The bid should include both an option for pre-cast concrete header AND an option for a cast-in-place concrete header, with cost specifications for both. On the outlet end of the culvert large armor rock/boulder material is required to stabilize the embankment from the road edge to the bottom of the bank. Size of ditch stone is expected to be approximately 8 inch or greater ditch stone. This rip-rap material on the slope should be 1 foot to 2 feet to the toe of the slope and 100 feet in length. o Culvert 10: This culvert requires a new concrete header to replace the current stone header. The bid should include both an option for pre-cast concrete header AND an option for a cast-in-place concrete header, with cost specifications for both. Gravel material will be required for Culvert 9 installation as well as for increasing the width and length of the current road area surrounding both Culverts 9 and 10. The finished road area is estimated to be a minimum of 20 feet wide and the length to be approximately 100 feet. o Culvert 28: The current 15 inch corrugated metal culvert must be replaced by an 18 inch by 34 foot plastic culvert. Stone headers will be added to the culvert inlet. The Town will supply the culverts. o Culvert 31: The current 15 inch corrugated metal culvert will be replaced by an 18 inch by 34 foot plastic culvert. This culvert is above Culvert 28. The Town will supply the culverts. Putney Mountain Road will be closed during regular working hours for the duration of all repairs. During the advertisement and pre-bid phase of this job, all questions may be addressed to Road Supervisor E. Mark Bills by phone at (802) 258-1389 or email at emarkbills@gmail.com. Notify Dorothy Maggio at (802) 365-7071 if you wish to submit a bid electronically. The town of Brookline reserves the right to accept or reject any or all bids that are deemed to be in the best interest of the Town. Insurance documentation must be included with BID.This is a Lump Sum project. There will be no progress payments for the lump sum bid, final payment will be issued after work has been accepted by the Town. GENERAL: All materials and construction shall conform to State of Vermont Agency of Transportation Standard Specifications for Construction 2018, and its latest revisions, and the AASHTO Standard Specifications for Highway Bridges, 17 bEdition, dated 2002 and its latest revisions. o This project will be developed and administered by the Town of BrooklineContinuous communications will be maintained between the Town, the Project Manager and Contractor. o The Contractor will be responsible for coordinating with the Utility Company if necessary. Utility poles will not be relocated during construction. All woody debris generated by the project will become the property of the Contractor and must be disposed of off-site. o Putney Mountain Road will be closed to traffic during working hours for this project. Proposals shall indicate the intended schedule, steps and tasks, material quantity and types, that are proposed by the contractor, and shall contain a cost estimate for the proposed services and materials. The Town may waive any informalities, technicalities, minor defects or reject any and all Proposals if in its sole judgement the best interests of the Town will be served. Any proposal received after the time and date specified shall not be considered.

Award

Bridges / Tunnels

$17,380.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
146
Bidding Soon
2,175
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2023

August 4, 2023

img_map_placeholder

Putney Mountain Rd, Brookline, VT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.