Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Stevenson, Washington. Completed plans call for site work for a water / sewer project.

The work to be performed consists of furnishing all permits, labor, materials, and equipment necessary for the construction of the Kanaka Pump Station Improvements, Fairgrounds Pump Station Improvements, and the Cascade Avenue Pump Station Improvements including all electrical work, instrumentation, mechanical work, concrete structure installation, surfacing improvements, and site work complete with all appurtenant piping, valves, appurtenances and all work incidental to or necessary for satisfactory completion of the work shown on the Drawings and described in the Specifications Bids are requested for the following Contract: Collection System Improvements Phase II, WE#1477B Owner anticipates that the Project's total bid price will be approximately $2.5 Million. The Project has an expected duration of 360 days. all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

Bid Results

Water / Sewer

$2,849,364.00

Public - City

Site Work

105

35

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
69
Bidding Soon
1,167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

October 2, 2023

Project location map

To Be Determined, Stevenson, WA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed