BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a water / sewer project in Torrance, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Bids are being accepted by West Basin Municipal Water District (West Basin), for the Palos Verdes Recycled Water Pump Station Project. The work shall include, but not be limited to, the construction of the following: a building of approximately 785 square feet with an A-frame roof to house a booster pump station consisting of skid mounted centrifugal pumps, including three (3) pumps at 500 gallons per minute (gpm), and two (2) pumps at 28 gpm, all on variable frequency drives (VFDs); a 750-gallon bladder surge tank; connection to existing recycled water system; monorail; electrical equipment including transformer, switchboard, motor control center (MCCs); building mechanical; structural and architectural components; site fencing, new parking spots; application of slurry seal on parking area; drainage; educational exhibits, including all other appurtenances. Project Should be completed with 240 calendar days. This project will be partially funded by State and Federal Grants. Disadvantaged Business Enterprise (DBE) Participation requirements and all DBE good faith effort and other requirements are included in agreement. As part of the bid, contractor should make an effort to advertise for DBE participation for 30 days. DBE forms are included in the bid package. A BUILDING OF APPROXIMATELY 785 SQUARE FEET WITH AN A-FRAME ROOF TO HOUSE A BOOSTER PUMP STATION CONSISTING OF SKID MOUNTED CENTRIFUGAL PUMPS, INCLUDING THREE (3) PUMPS AT 500 GALLONS PER MINUTE (GPM), AND TWO (2) PUMPS AT 28 GPM, ALL ON VARIABLE FREQUENCY DRIVES (VFDS); A 750-GALLON BLADDER SURGE TANK, CONNECTION TO EXISTING RECYCLED WATER SYSTEM, MONORAIL; ELECTRICAL EQUIPMENT INCLUDING TRANSFORMER, SWITCHBOARD, MOTOR CONTROL CENTER (MCCS), BUILDING MECHANICAL, STRUCTURAL AND ARCHITECTURAL COMPONENTS; SITE FENCING, NEW PARKING SPOTS, APPLICATION OF SLURRY SEAL ON PARKING AREA; AND DRAINAGE, INCLUDING ALL OTHER APPURTENANCES

Award

Water / Sewer

$2,284,250.00

Public - City

New Construction, Site Work

60

48

14

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
110
Bidding Soon
2,312
All Active Projects
1,016
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

January 1, 2024

img_map_placeholder

3920 W 235th St, Torrance, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.