BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Hill Air Force Base, Utah. Contact the soliciting agency for additional information.

UPDATE (14 August 2023) The USAF anticipates holding an Industry Day for interested parties regarding the Automatic Switching Unit-Replacement Program (ASU-R) on Wednesday, 30 August 2023 from 8:00AM to 5:00PM at Hill AFB, UT. At this time the tentative schedule is as follows: 8AM-10PM Requirements Briefing 10:30AM - 12:30PM SMIC Tour 12:30PM - 1:30PM Lunch 1:30PM - 5:00PM One-on-One Contractor Briefings/Q&A One-on-One meetings will be provided upon request. Please respond with your availability and potential attendees no later than 4:00PM MST, Tuesday, 28 August 2023. The POC for this event is Dan Scheer, dan.scheer@us.af.mil. NOTICE: This is not a solicitation but rather a Sources Sought to determine potential sources for information and planning purposes only. The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is 541330. As applicable, the contractor shall ensure that all applicable Commercial-Off-The-Shelf (COTS) IA and IA- enabled products comply with AFI 33-200, Information Assurance. Some of these products must be Committee on National Security Systems Policy 11 (CNSSP-11) compliant, requiring them to be validated by accredited labs under the National Information Assurance Partnership (NIAP) Common Criteria Evaluation and Validation Scheme or National Institute of Standards and Technology (NIST) Federal Information Processing Standards (FIPS) Cryptographic Module Validation Program (CMVP) as identified in the sections below. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small businesses to include 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns. The government requests that interested parties respond to this notice if applicable and identify your small business status to the identified NAICS code. If applicable, please provide any anticipated teaming arrangements, along with a description of similar services offered to the Government and to commercial customers for the past three years. Any responses involving teaming agreements should delineate between the work that will be accomplished by the prime and the work accomplished by the teaming partners. Program Details: Air Force Nuclear Weapons Center (AFNWC) has a requirement for the following: Modifications to current approved design: For equipment currently installed at the Hill Air Force Base (AFB) System Missile Integration Complex (SMIC) Installation and Testing: For solution located in the SMIC Tech Data Package: Complete Data package for the Design Solution above (Gov. to retain full rights) User Type-1 Training: Conduct Type-1 training on new system for Active Duty Trainers Random sample nuclear hardness testing at Gov approved facility: To be conducted through Production and Deployment (P&D) phase Production and shipping of ASU-R "kits": Wing I, Malmstrom MT kits consist of Automatic Transfer Switch (ATS) and all supporting equipment Wing III, Minot ND kits consist of ATS, Diesel Electric Unit (DEU), and Day Tank with all supporting equipment Deployment of ASU-R kits to wing Missile Alert Facilities (MAFs) The primary components making up the current approved design for the backup Transfer Power System (TPS) are as follows: Commercial Off The Shelf (COTS) in accordance with FAR 2.101 (b) (1)(2)(3)(4)(5)(6) or Commercial Off The Shelf (COTS), IAW, FAR "Commercially available off-the-shelf (COTS) item" 2.101 (b)(1)(2) ATS (replaces and combines the functionality of the current Automatic Switching Unit (ASU) and Minuteman III (MMIII) Power Processor (MPP) made by ASCO DEU made by Cummins Fuel Day Tank made by Simplex All hardware for connecting and installing Scope The SOW (Request SOW via POC listed in this Sources Sought Synopsis) defines the services required to correct the deficiencies identified in the current approved ASU-R design, and the deliverables essential for P&D phase shall include all required modifications, testing, kitting, shipping, installation/deployment, and training. The AFNWC ICBM Systems Directorate at Hill AFB Utah, provides the systems engineering and program management of the ASU-R program. Air Force Global Strike Command (AFGSC) operates the facilities which will receive the equipment provided by this program. Background The MMIII ASUs and MPPs currently in operation at active Wing MAFs are aging and no longer supportable. The ASUs and MPPs function to provide electrical standby power source transfer capability between the commercial (normal) utility source and the DEU (standby) power source. The ASU provides power source switching and generator relay control functions, while the MPP monitors and controls the ASU. A modern ATS will replace both the ASU and MPP and combine them into one supportable unit. The ASU-R Program is intended to replace legacy hardware that has faced obsolescence with a COTS solution to provide a smaller logistical footprint and increased reliability. The new DEU is also a COTS solution providing the latest and most reliable diesel electric power generation. The Engineering Manufacturing and Development (EMD) phase produced the engineering documentation required for the P&D phase, including equipment specifications, drawings, computer models, interface drawings, installation and demolition drawings, and Technical Orders (TO). Aspects of the tech data package will need to be updated based on the modifications during the P&D phase. As a result of performing a SMIC Physical Configuration Audit (PCA) in 2020, some additional testing was conducted along with a System Requirement Document (SRD) review. The result of the testing and reviews identified design deficiencies that need to be addressed as "modifications" prior to deployment of new system. Any information submitted by respondents to this sources sought synopsis is voluntary. Sources sought notice is not to be construed as a commitment by the Government, nor will the Government reimburse any costs associated with the submission of information in response to this notice. Respondents will not be individually notified of the results of any government assessments. The Government's evaluation of the capability statements received will factor into whether any forthcoming solicitation will be conducted as a full and open competition or as a set-aside for small businesses, or any small business designation (e.g., SDVOSB, HUBZone, 8(a), WOSB, VOSB, etc.). Capabilities package All interested parties shall submit a capabilities package that explicitly demonstrates company capabilities indicating the following as applicable: Examples of commercial sales and product specifications related to this effort Whether you are the manufacturer, or provide the name and size of the manufacturer of the product(s) you will be supplying (the solution must be a COTS product) Indicate their status as a Foreign-owned/foreign-controlled firm and any contemplated use of foreign national employees on this effort Include in your capabilities package: DUNS, Cage Code, System for Award Management expiration date, GSA contract number and expiration (if applicable), Any related specifications/drawings Responses/Requests may be submitted electronically to the following e-mail address: dan.scheer@us.af.mil. Section I: Relevant Experience Please include responses to the following which indicate your firm's related experience: Describe your firm's experience in designing and producing backup Transfer Power Systems (TPS). What is your firm's experience in testing systems during and after installing equipment for backup TPS's What is your firm's experience in qualification testing, to include nuclear hardness testing Describe your firm's experience installing, maintaining, and testing equipment in extreme weather conditions at remote locations. Please describe your firm's experience relative to engineering, maintaining, troubleshooting and integrating complex systems for Federal, State, and Local Government approved subsystems. Please describe your firm's experience relative to engineering, maintaining, troubleshooting and integrating mobile backup transfer power systems for Federal, State, and Local Government approved subsystems. What experience does your company have with the following: generating, editing, reviewing, maintaining, and validating Drawings, Process Orders (PO's), Operating Instructions (OI's), Technical Orders (TO's) and Time Compliance Technical Orders (TCTO's) If given the opportunity to respond to a Request for Proposal (RFP), would your firm respond Does the overarching intention of the SOW make sense If not, which sections Section II: Technical Capability Please include responses to the following which indicate your firm's related experience: What relevant simulation and analysis tools does your firm have access to (describe experience using these tools) If you plan to subcontract, what percentage and portion of the SOW will you subcontract and with whom Describe your ability to manage sub-contractors, in terms of schedule, budget, and technical performance. What access do you have to government shared databases (please provide examples) How would you recommend reporting and providing system data on a regular basis to the PMO What contract type would you think is appropriate for this the ASU-R program effort based on the requirements mentioned in the SOW (Section 3 Requirements) What timeframe do you estimate your firm could complete the work described in the SOW What potential risks do you see in terms of cost, schedule, and performance For the potential risks mentioned above, how would you eliminate or mitigate those risks identified Explain your ability to update information (e.g., Interface Control Documents (ICD), Engineering Orders (EO), Engineering Change Notices (ECN), Engineering Change Orders (ECO), Technical Orders (TO) and Specifications). Please describe your firm's process for handling configuration management. The program Statement of Work (SOW) and System Requirements Document (SRD) can be obtained by requestiug them from Dan Scheer, at dan.scheer@us.af.mil. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
33
Bidding Soon
542
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

img_map_placeholder

Multiple Locations, Hill Air Force Base, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.