Published July 19, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Palmer, Alaska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Matanuska-Susitna Borough is requesting bids from qualified contractors to pave roads in the Matanuska-Susitna Borough. This project involves, but is not limited to: roadway reconditioning, re-establishing ditches, import and placement of base course, and paving of the roadway, driveway tie-ins, cul-de-sacs, public approaches, ATV ramps, and mailbox pullouts. See the Bid Document for detail. Schedule A Ridgefield Drive & Drinkhouse Drive: Remove 4 of existing surface course. Use for tapering gravel driveways, and as directed. Waste any excess off site. D-1 import is 3 thick. Pavement section is 2 HMA, 20 wide. Gravel shoulders are 1-2 wide of D-1. Estimated to be less than $110,000. Schedule B Moose Park Subdivision Phase II: Remove 4 of existing surface course. Use for tapering gravel driveways, and as directed. Waste any excess off site. D-1 import is 3 thick. Pavement section is 2 HMA, 20 wide. Gravel shoulders are 1-2 wide of D-1. Estimated to be less than $485,000. Add Alternative #1 S Marina Circle: Remove 4 of existing surface course. Use for tapering gravel driveways, and as directed. Waste any excess off site. D-1 import is 3 thick. Pavement section is 2 HMA, 2 wide. Gravel shoulders are 1-2 wide of D-1. Estimated to be less than $70,000. Add Alternative #2 E Forest Grove Circle: Remove of existing surface course. Use for tapering gravel driveways, and as directed. Waste any excess off site. D-1 import is 2 thick. Pavement section is 2 HMA, 18 wide. Gravel shoulders are 1 wide. Adjust the existing Manhole to match finish asphalt surface. Estimated to be less than $70,000. Add Alternative #3 Copper Creek Speed Humps: Place three speed humps on Copper Creek near the Williwaw Community Park. Refer to the site map for the approximate location of the three speed humps. Maintain the spacing between the two speed humps south of E. Chickaloon Road. Estimated to be less than $30,000. The Matanuska-Susitna Borough reserves the right to accept or reject any or all bids, waive any and all technicalities or informalities it deems appropriate. Award of this project is subject to the availability of funding. Questions Due Date Online Portal Deadline to submit Questions Jul 6th 2023, 5:00 PM AKDT All work shall be complete by August 30, 2024

Award

Roads / Highways

$613,065.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
2
Bidding Soon
147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2023

August 14, 2023

Project location map

Multiple Locations, Palmer, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.