BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a mixed-use development in Stockton, Utah. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a municipal facility.

This project will require: Site Work, Concrete Footings and Foundation, Erection of a pre-engineered metal building, Electrical, and Plumbing. PLEASE NOTE: Plumbing and Electrical will be design build. As of October 3, 2023, an awarded General Contractor is now seeking subcontractors for this project. From orig solicitation: The Project includes the following Scope of Work: o Provide 40-foot by 70-foot metal exterior building including building specifications and plans. o Building type shall be proposed by Builder/Supplier. o Footings and foundation as required by building supplier. o Include on building two overhead doors - one 14-feet wide by 14-feet high, one 12-feet wide by 12-feet high -- and one man door or similar. o Provide garage door openers for the overhead doors. o Insulate building meeting the International Building Code. o Include in building a restroom with sewer and water connections and concrete floor. o Supply building with a 100 Amp electrical service. o Include in building a combination of natural and electrical lighting. o Provide grading to facilitate building construction. o Leave building floor natural (except restroom).

Post-Bid

Municipal

$2,000,000.00

Public - City

New Construction, Site Work

29

8

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
81
Bidding Soon
988
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

February 4, 2024

Project location map

30 West Dutch Avenue, Stockton, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.