BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Reading, Pennsylvania. Working plans call for site work for a water / sewer project.

As of November 10, 2023, the project has not been awarded. A timeline for award has not been confirmed. The City of Reading reserves the right to accept or reject any and all bids, and to accept or reject any part of a bid, as may be in the public interest. Each proposal shall be accompanied by bid surety in the amount of ten percent (10%) of the proposal. A certified check or bid bond will be accepted. Question Deadline 08/08/2023 at 2:00 PM ET The Work shall include, but not necessarily be limited to, furnishing all materials, performing all labor and constructing the following, complete in place: A. MOBILIZATION AND DEMOLITION 1. Mobilize equipment, personnel and materials to the project site as necessary to construct the project improvements. Includes all associated travel, fuel, rental, and other associated fees, meeting contract general conditions requirements (including bonds and insurance), and demobilization upon project completion. Includes provision of a job site trailer and portable toilet. Trailer may be placed in the identified Material Storage area or in the adjacent Masano Auto parking lot. Includes providing temporary security fencing at the Reading Truck Group entrance area, as needed. Includes construction stakeout, project management, and project scheduling; clean up and removal of any construction debris, waste, excess materials, etc.; and all start up and close out costs. It will be paid in multiple installments over the life of the project. (Lump Sum) 2. Furnish, install, and maintain all temporary erosion and sedimentation control measures as per the approved Erosion and Sediment Control Plan, as indicated, for the duration of the project. Includes resolving any issues identified by the OWNER and/or the Berks County Conservation District and/or the ENGINEER. Includes removal of all temporary erosion control measures at the conclusion of the Work.

Final Planning

Water / Sewer

$1,891,987.00

Public - City

Site Work

34

7

10

4

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
112
Bidding Soon
2,094
All Active Projects
961
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

April 2, 2024

img_map_placeholder

Multiple Locations, Reading, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.