Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Wausau, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The work under this contract shall consist of removal of sidewalk and curb and gutter, salvaging and reinstalling existing brick pavers, common excavation, base aggregate dense, concrete curb and gutter, concrete sidewalk, landscaping, and all incidental items necessary to complete the work as described in this contract. Saw cutting/Sidewalk/Pavement, Sidewalks/Curbs/Gutters Pre-Qualification: Yes SCOPE OF WORK: The work under this contract shall consist of removal of sidewalk and curb and gutter, salvaging and reinstalling existing brick pavers, common excavation, base aggregate dense, concrete curb and gutter, concrete sidewalk, landscaping, and all incidental items necessary to complete the work as described in this contract. 3. PROSECUTION AND PROGRESS: General Weather permitting, work may begin any time after execution of the contract and all work shall be completed by October 13 th , 2023, with the exceptions as noted below. No work shall take place on Jefferson Street/3 rd Street orJefferson Street/4 th Street until after August 23 rd , 2023. All sidewalks within the project limits shall be open for use on September 9 th and September 10 th , 2023. Removal/Replacement Time: When a removal is made (sidewalk, curb and gutter, pavement), the Contractor shall have the new concrete poured within 7 calendar days of removal. Any days beyond 7 calendar days for each replacement the City will be enforcing the contract language in the General Conditions, Article 41 (Liquidated Damages) on page 27 of the General Conditions. Restoration Timeline: All topsoil, seeding and restoration must be complete 7 days after pouring the concrete. Any days beyond 7 calendar daysfor each replacement theCity will be enforcing the contract language in the General Conditions, Article 41 (Liquidated Damages) on page 27 of the General Conditions.
Award
Sidewalks / Parking Lot
$141,630.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2023
September 7, 2023
Multiple Locations, Wausau, WI
Related To This Project
Wausau, WI
Bid Date: Aug 22 2023
Wausau, WI
Bid Date: Nov 03 2023
Wausau, WI
Bid Date: Sep 12 2023
Wausau, WI
Bid Date: Sep 26 2023
Wausau, WI
Bid Date: Sep 12 2023
Wausau, WI
Bid Date: Sep 19 2023
Wausau, WI
Bid Date: Mar 31 2021
Wausau, WI
Bid Date: Feb 03 2022
Wausau, WI
Bid Date: Aug 29 2023
Wausau, WI
Bid Date: Oct 09 2019
Wausau, WI
Bid Date: Jul 18 2023
Wausau, WI
Bid Date: Oct 21 2021
Wausau, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.