BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Wausau, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work under this contract shall consist of removal of sidewalk and curb and gutter, salvaging and reinstalling existing brick pavers, common excavation, base aggregate dense, concrete curb and gutter, concrete sidewalk, landscaping, and all incidental items necessary to complete the work as described in this contract. Saw cutting/Sidewalk/Pavement, Sidewalks/Curbs/Gutters Pre-Qualification: Yes SCOPE OF WORK: The work under this contract shall consist of removal of sidewalk and curb and gutter, salvaging and reinstalling existing brick pavers, common excavation, base aggregate dense, concrete curb and gutter, concrete sidewalk, landscaping, and all incidental items necessary to complete the work as described in this contract. 3. PROSECUTION AND PROGRESS: General Weather permitting, work may begin any time after execution of the contract and all work shall be completed by October 13 th , 2023, with the exceptions as noted below. No work shall take place on Jefferson Street/3 rd Street orJefferson Street/4 th Street until after August 23 rd , 2023. All sidewalks within the project limits shall be open for use on September 9 th and September 10 th , 2023. Removal/Replacement Time: When a removal is made (sidewalk, curb and gutter, pavement), the Contractor shall have the new concrete poured within 7 calendar days of removal. Any days beyond 7 calendar days for each replacement the City will be enforcing the contract language in the General Conditions, Article 41 (Liquidated Damages) on page 27 of the General Conditions. Restoration Timeline: All topsoil, seeding and restoration must be complete 7 days after pouring the concrete. Any days beyond 7 calendar daysfor each replacement theCity will be enforcing the contract language in the General Conditions, Article 41 (Liquidated Damages) on page 27 of the General Conditions.

Award

Sidewalks / Parking Lot

$141,630.00

Public - City

Paving, Site Work

35

5

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
19
Bidding Soon
212
All Active Projects
85
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

img_map_placeholder

Multiple Locations, Wausau, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.