BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pagosa Springs, Colorado. Completed plans call for site work for a water / sewer project.

This project includes assessing current site conditions to find the best possible solutions for the follow: excavating and installing a new sewer cleanout, assessing/descaling the sewer lines within the foundation, and replacing the sewer main that leads to the existing cleanouts. See attached drawings. PROJECT NAME: PAGOSA RANGER STATION SEWER LINE REPAIRS PROJECT LOCATION: Pagosa Ranger Station (Archuleta County) 180 Pagosa St. Pagosa Springs, CO 81147 SUMMARY OF WORK: This project is to assess current site conditions, excavating and installing a new sewer cleanout, assessing/descaling the sewer lines within the foundation, and replacing the sewer main that leads to the existing cleanouts. PREBID MEETING/SITE VISIT: SEE Section L C.1 SCOPE OF CONTRACT This project includes assessing current site conditions to find the best possible solutions for the follow: excavating and installing a new sewer cleanout, assessing/descaling the sewer lines within the foundation, and replacing the sewer main that leads to the existing cleanouts. See the attached document, "3.1-Drawing Set 1-Pagosa Sewer Line Repair" for more details. C.2 PROJECT LOCATION The project is located at 180 Pagosa St. Pagosa Springs, CO 81147 at the Pagosa Ranger Station (Archuleta County). From Durango, Colorado head east on Highway 160 for 60 miles. Take a left on North 2nd street and the building is located on the right. C.3 MAGNITUDE OF CONSTRUCTION PROJECT Less than $25,000.00 C.4 TECHNICAL SPECIFICATIONS 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. Period of Performance: 08/28/2023 to 11/28/2023

Post-Bid

Water / Sewer

$25,000.00

Public - Federal

Site Work

4

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
58
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2023

August 28, 2023

img_map_placeholder

180 Pagosa St, Pagosa Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.