Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Greenville, Georgia. Working plans call for the renovation of a detention facility; and for site work for a detention facility.
"As of August 25,2023, no bids received. A timeline for the rebid date of this project is not yet available." The Meriwether County Board of Commissioners shall accept proposals to remove and replace plumbing fixtures, piping, and sanitary sewer assessment in Meriwether County Jail. All questions concerning the Request for Proposal shall be addressed in writing to Theron Gay, Special Projects Director, at t.gay@meriwethercountyga.gov. This project includes scoping/videoing of the existing sanitary sewer lines within the jail complex and to connections at exterior sewer lines and a written report of the existing conditions provided to the County with recommendations for repair. b. Install Backflow preventer valve, pressure regulator and shutoff valve in valve boxes on customer side of water meter. c. Remove 36 existing porcelain/stainless steel toilets and sinks in 4 cell blocks, 6 isolation cells, and 2 booking cells and replace with stainless steel toilet/sink combo units with toilet paper holders in all cells and day rooms. Each cell block shall have (1) ADA stainless steel toilet and stainless-steel sink unit in 1 (one) ground level cell. One of the two booking cells shall have an ADA stainless steel toilet and stainless-steel sink. All stainless-steel units shall be Acorn Engineering Co, Bradley Corp. or equivalent. Replace 7 (seven) existing stainless-steel ligature-resistant flush mounted shower units with the new stainless-steel units. All stainless-steel units shall be Acorn Engineering Co., Bradley Corp. or equivalent. d. This proposal includes removing, replacing, and painting any concrete block walls necessary to install new fixtures. e. Replace all secondary water supply lines, mixing valves, and flush valves in plumbing chases from primary supply line to new toilet/sink/shower units. Replace sanitary sewer Ts'. f. Replace electrical outlet boxes and switch boxes with non-corrosive plastic boxes in all water chases. g. All existing stainless-steel units (old) shall be removed from the Jail facility and stockpiled in the fenced jail holding area behind the jail building. All existing porcelain toilets and sinks shall be removed from the Jail facility and disposed of by the contractor. All removed piping and material used in this project shall be removed from the facility and properly disposed of by contractor, except any copper or metal piping and materials removed, shall be stockpiled on premises as noted above. h. This contract shall commence upon notice to proceed and extend for a period of 90 days after the receipt of materials. i. List all principal and subcontractors who will be working on this project, including references and experience in similar type construction. j. Proposals will be opened and recorded immediately following the deadline for the submittal. The proposals will be reviewed, evaluated, and ranked by Meriwether County. k. The Proposer shall accept the project in its present condition and carry out all work in accordance with the requirements of the specifications as directed by the County. l. The Proposer, before submitting a Proposal, will be required to attend a Pre-proposal meeting and examine the scope and extent of the project. m. The Contract Documents contain the provisions required for the completion of the work to be performed pursuant to this Contract. Information obtained from an Officer, agent, or employee of Meriwether County or any other person shall not affect the risks or obligations assumed by the Contractor or relieve him from fulfilling any of the conditions of the Contract. Each Proposer is responsible for inspecting the site and for reading and being thoroughly familiar with the Contract Documents. The failure or omission of any Proposer to so familiarize himself shall in no way relieve any Proposer from any obligation in respect to his Proposal. n. Proposer understands that any site visit, inspection, or construction activities must be coordinated with the Meriwether County Sheriff's Office in advance.
Final Planning
Water / Sewer
$400,000.00
Public - County
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 16, 2023
December 25, 2023
17400 Roosevelt Hwy, Greenville, GA
Related To This Project
Greenville, GA
Bid Date: Nov 19 2021
Greenville, GA
Bid Date: Mar 24 2022
Greenville, GA
Bid Date: Dec 14 2023
Greenville, GA
Bid Date: Dec 19 2023
Greenville, GA
Bid Date: Dec 19 2023
Greenville, GA
Bid Date: Feb 05 2024
Greenville, GA
Bid Date: Apr 12 2024
Greenville, GA
Bid Date: Jul 25 2023
Greenville, GA
Bid Date: May 26 2023
Greenville, GA
Bid Date: May 19 2023
Greenville, GA
Bid Date: Apr 11 2023
Greenville, GA
Bid Date: Mar 02 2023
Greenville, GA
Bid Date: May 19 2023
Greenville, GA
Bid Date: May 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.