Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2023

September 13, 2023

January 11, 2024

Bid Results

Water / Sewer

$118,600.00

Public - County

Demolition, New Construction, Renovation, Site Work

img_map_placeholder

Multiple Locations, Throop, PA

8

5

11

4

Subscribe to View Full Documents

Demolition, site work, new construction and renovation of a water / sewer project in Throop, Pennsylvania. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project location 1 is the Authoritys Clinton Wastewater Treatment Plant accessed from the entrance road located at 19 Commerce Boulevard, Forest City PA 18421. Project location 2 is the Authoritys Throop Wastewater Treatment Plant at 145 Boulevard Avenue, Throop PA 18512. Work shall consist of 1. Replacement of the existing Clinton WWTP control building ballasted membrane roof (approx. 1,600 S.F., to be replaced with non-ballasted roof) including insulation, flashings and related accessories. A 20% contingency line item has been included in the bid to replace roof decking as needed 2. Replacement of the existing Throop WWTP Garage nonballasted membrane roof (approx. 1,600 S.F.) including insulation, flashings and related accessories. A 20% contingency line item has been included in the bid to replace roof decking as needed Work shall include partial demolition and replacement of the existing control building membrane roof including, decking, insulation and associated flashing. Roofing shall be removed down to the existing steel decking. Decking shall be removed and replaced as indicated on the Plans or as directed by the Owner. Install new adhered membrane roof including EPDM membrane, insulation, and flashings. The contractor shall provide and install all required materials and incidental items, whether specifically indicated or not, as needed to provide a complete and watertight installation meeting the requirements of the manufacturer. The contractor shall remove the existing roofing system, including membrane, insulation, flashings, ballast and all other components as needed down to bare decking. Remove steel decking where indicated on the plans or where directed. The contractor shall remove and legally dispose of all demolition waste. The contractor shall provide temporary cover as needed to prevent water leakage into the building interior during and after demolition until the new roofing system is installed and made watertight. The contractor shall be responsible for any damages to the Owner's facilities due to water leakage or otherwise resulting from the contractor's activities. Question Deadline 08/07/2023 at 4:00 PM ET.

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
314
Active Projects
200
Bidding Soon

Related Projects


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.