BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a detention facility in Saint Charles, Missouri. Completed plans call for the renovation of a detention facility.

**As of October 11, project was awarded to Paric Corporation. but awarded amount is not available.** St. Charles County is seeking proposals from qualified firms to provide Construction Manager at Risk - Renovation of Corrections Facility. The County reserves the right to terminate the RFQ process for any reason at any time and post notification of such decision on the same website where this RFQ is posted. Check the County's website frequently for updates and any notifications that may be issued pertaining to this RFQ St. Charles County, Missouri, is hereby issuing this Request for Qualifications (RFQ) to solicit qualifications for a general contractor, to provide Construction Manager At-Risk (CMaR) services to manage the renovation of the St. Charles County Corrections Facility located at 301 N. 2nd St., St. Charles County, MO 63301. The County is seeking and inviting proposals from firms that are qualified, able, and willing to provide the services described herein to St. Charles County, Missouri ("County"). Inquiries All questions or clarifications concerning this RFQ must be submitted in writing via Email to: Kurt Mandernach, Purchasing Manager St. Charles County Government Finance Department 201 North Second Street St. Charles, Missouri 63301 kmandernach@sccmo.org The RFQ number and title shall be referenced in all correspondence. The County must receive all questions no later than 2:00 PM on 8/8/23. Any question received after this deadline may not be answered. Budget: The total project budget is $40 million, which includes all soft costs, furniture, fixtures, and equipment, as well as direct construction cost. This is generally subdivided into fifth floor improvements of $15 million, and third floor improvements of $25 million. The thirdfloor improvements are funded through the American Rescue Plan Act program which has specific requirements in both schedule and recordkeeping. 4. Project Schedule: Below are the current anticipated major activity dates for the project. Critical milestone dates are noted in RED. These are ARPA required deadline dates for committing funds under contracts and disbursing all payments. These deadlines are specifically tied to the third floor. The third-floor work cannot begin until the fifth floor is fully operational, therefore it is critical that the fifth-floor work is completed as expeditiously as possible. Project Activities Start Finish Fifth Floor Renovations 7/17/2023 2/28/2025 Fifth Floor Renovations Design 7/17/2023 1/31/2024 Preconstruction 9/30/2023 1/31/2024 New Kitchen Guaranteed Maximum Price 2/01/2024 2/01/2024 Demolish New Kitchen Space 2/01/2024 2/28/2024 New Kitchen Construction 3/01/2024 1/31/2025 Start Up New Kitchen 2/01/2025 2/28/2025 Third Floor Renovations 7/17/2023 7/31/2026 Third Floor Renovations Design 7/17/2023 8/01/2024 Third Floor Guaranteed Maximum Price 10/31/2024 10/31/2024 All Costs Committed Deadline 2024 12/31/2024 12/31/2024 Demolish Third Floor Areas 3/03/2025 5/30/2025 Renovate Third Floor 6/01/2025 7/31/2026 Owner Move-In Third Floor 8/01/2026 10/01/2026 Contract Closeout 10/01/2026 12/01/2026 Funds Disbursed Deadline December 31, 2026 12/31/2026 12/31/2026 Scope of Work: The Offeror has overall responsibility for, and shall provide,complete Pre-Construction Phase and Construction Phase Services and furnish all materials, equipment, tools, and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner's requirements and the terms of the Contract Documents. A. Preconstruction Services: The Pre-Construction Phase shall be deemed to commence upon the date specified in a Notice to Proceed with PreConstruction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Offeror is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the Notice to Proceed. Pre-Construction Phase Services may overlap with Construction Phase Services.

Award

Jails / Prisons

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
58
Bidding Soon
827
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2023

March 1, 2024

img_map_placeholder

301 S 2nd St, Saint Charles, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.