Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 20, 2023 at 8:00 PM
Updated November 15, 2023
Site work and paving for a road / highway in Aurora, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Fabrication and installation of decorative black metal railing (various heights), repair of the existing concrete barrier wall, new slab foundation and any other ancillary improvements. During the progress of the work the Contractor shall assume total risk and liability, and will be responsible for any and all damages to the work, or to persons, or to public or private property caused by, or in any way resulting from doing the work, including actions of Subcontractors or Material Suppliers. All work required to install the improvements shown or called for on the plans and in the specifications, shall be incidental to the various bid items in the proposal even though a specific item is not shown, and no additional compensation shall be made to the Contractor, unless it is indicated that additional payment will be allowed or a unit price is provided for said work in the contract. Along the floodwall of the west branch of the Fox River, immediately north of the Benton Street Bridge in downtown Aurora and misc. replacement of railing throughout the downtown. Installation of decorative metal fencing, misc. railing replacement, concrete wall repair and slab fencing foundation. If after the approval of final payment for each class of work and prior to the expiration of 1 year after the date of approval of said final payment, or such longer period of time as may be prescribed by law or by terms of any applicable special guarantee required by the Contract Documents, any work is found to be defective, the Contractor shall promptly, without cost to the Owner and in accordance with written directions of the Owner, remove it from the site and replace it with non-defective work to the satisfaction of the Engineer. Failure of the Contractor to complete or to remedy defective work within a reasonable time (not to exceed 30 days of notice to Contractor in any event) shall be deemed a default and the Owner may take steps as it deems necessary to complete or remedy said work and charge the cost thereof to the Contractor. All questions must be received by 5:00 P.M., August 1, 2023.
Post-Bid
Roads / Highways
$610,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2023
September 8, 2023
E Benton St, Aurora, IL
Related To This Project
Aurora, IL
Bid Date: Aug 29 2023
Aurora, IL
Bid Date: Aug 17 2023
Aurora, IL
Bid Date: Aug 16 2023
Aurora, IL
Bid Date: Aug 23 2023
Aurora, IL
Bid Date: Aug 22 2023
Aurora, IL
Bid Date: Aug 25 2023
Aurora, IL
Bid Date: Aug 30 2023
Aurora, IL
Bid Date: Aug 06 2021
Aurora, IL
Bid Date: Aug 09 2023
Aurora, IL
Bid Date: Feb 22 2022
Aurora, IL
Bid Date: Aug 02 2023
Aurora, IL
Bid Date: Aug 09 2023
Aurora, IL
Bid Date: Jul 26 2023
Aurora, IL
Bid Date: Jul 12 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed