BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 26, 2023 at 8:00 PM

Updated January 27, 2024

Demolition, site work, paving and new construction of a civil project in West Milford, New Jersey. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Route 23, Bridge over Pequannock River/Hamburg Turnpike, Contract No. 017083470, Bridge Replacement, Grading, Paving, Drainage & Utilities, Township of West Milford, Passaic County; Boroughs of Kinnelon & Butler, Morris County; Federal Project No: 0023(332), UPC No: 083470, PE No: 1405508, CE No: 1405517, DP No: 23131. Estimated Range between $50,000,001 to $75,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 4 or 5 Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning the Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any and/or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: Bridge Replacement, Grading, Paving, Drainage & Utilities - Route 23 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline for submitting inquiries will not be extended and is 12:00 noon on August 15, 2023.

Award

Bridges / Tunnels

$78,248,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

271

16

71

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
810
Active Projects
289
Bidding Soon
6,866
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

November 8, 2023

Project location map

Multiple Locations, West Milford, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.