BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in College Park, Maryland. Completed plans call for the construction of a 160,000-square-foot, six-story above grade pre-engineered storage facility; for site work for a pre-engineered storage facility; and pre-engineered storage facility.

The Whiting-Turner Contracting Company has been selected by The University of Maryland, College Park Department of Procurement and Strategic Sourcing to provide full design-build services for the Stanley R. Zupnik Hall Project in College Park, MD. We invite trade subcontractors to submit prequalifications to participate in pursuing the subcontractor trade packages listed on the following page for the GMP-2 Early Release Bid Package. Please note that all subcontractors must be prequalified by The Whiting-Turner Contracting Company in order for their bid proposal to be considered. See also the anticipated procurement schedule on the following page. Project Description: The proposed Interdisciplinary Engineering Building involves the construction of a new, six-story structure plus basement with an approximate size of 160,000 GSF. The building includes six primary levels including the basement, occupied by offices, instructional space, research laboratories, seminar rooms, conference rooms, and support space. The upper level is used as an enclosed mechanical penthouse, with portions acting as exterior roof wells for outdoor mechanical equipment. The northeast main entrance will feature a multi-story atrium that extends from the basement through fifth floors. The building steps out beyond the first floor footprint on the north, east, and south sides of the building to provide additional square footage. This project will be pursuing minimum LEED Silver Certification under LEED v4 for New Construction. MBE Goals: This project has a Minority Business Enterprise (MBE) participation goal of thirty percent (30%) with subgoals of eight percent (8%) African American-Owned and eleven percent (11%) Women-Owned businesses. All MBE subcontractors and suppliers must be certified by the Maryland Department of Transportation (MDOT) in order for contract dollars to be counted toward project goals. Bid Packages: Bid Package Description 01A Miscellaneous Temporary Labor 03A Structural Concrete (Concrete Frame & Foundation) 07A Miscellaneous Rough Carpentry 07A Below Grade Waterproofing 22A Below Grade Plumbing 26A Below Grade Electrical & Electrical Distribution Equip. African American MBE Participation (%): 8.0 % Anticipated Schedule: o Anticipated Intent to Award Trade Packages December 2023. o Construction Start: Planned start of 1st Quarter 2024. o Construction End: Planned substantial completion of Spring 2026. Prequalification Directions: o Contact Tad.ShifflettAWhiting-Turner.com and Andrew.ImirieAWhiting-Turner.com to request prequalification forms o Complete the forms and email to: Tad Shifflett and Andrew Imirie

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$86,000,000.00

Public - City

LEED Certification, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
464
Active Projects
252
Bidding Soon
3,488
All Active Projects
1,417
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 1, 2023

January 1, 2024

March 31, 2026

img_map_placeholder

To Be Determined, College Park, MD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.