BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Effingham, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase III engineering services are required to provide assistance in construction inspection services for construction projects throughout District Seven. The Consultant will be required to furnish one (1) to six (6) qualified staff as approved by the District to assist District Resident Engineers/Technicians in performing the required construction inspection, materials inspection, survey/layout, prepare records, maintain documentation, provide general assistance as a member of a field crew and other duties to allow the timely completion of projects in accordance with state specifications. Projects requiring staffing may include, but not limited to, District wide patching and resurfacing contracts, or specific bridge projects, or urban rehabilitation projects. Quality Assurance (QA) oversight and Contractors Quality Control (QC) by the same Consultant or one of their Subconsultants on the same project or on material coming in from the same plant are prohibited. At the initial meeting, the Prime Consultant, and Subconsultant(s) will disclose all current relationships with contractors. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project The method of contractor selection has not been determined at this time. IDOT - 033 - RFQ - Various Phase III Construction Inspection Projects

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
43
Bidding Soon
415
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

img_map_placeholder

Multiple Locations, Effingham, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.