Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a military facility in Moore Haven, Florida. Working plans call for the construction of a 1,343-square-foot military facility; and for site work for a military facility.
As per Addendum 6 bid has been cancelled. The Jacksonville District Contracting Division has a requirement from the South Florida Operations Offices (SFOO) - Operations Division to provide a request for proposal for a of a Firm Fixed Priced (FFP) contract, utilizing Two-Phase Selection Procedures (See FAR 36.303). This FFP Contract is issued to obtain for a proposed new high sustainable lockhouse building. This building will serve as a lock and spillway control building for the Ortona Lock and Dam. This new building (approximately net conditioned 1,343 square feet including garage) is intended to house equipment that controls the operations of the lock and dam. The overarching building code is UFC 1-200-01 which has modifications and provisions to the International Building Code, however this building must also be designed as a High- Sustainable Building per UFC 1- 200-02, in particular Chapter 2. The building must be structurally and architecturally designed as a hurricane storm shelter in accordance with ICC 500. The structure including all openings must be inherently missile impact resistant without any additional protection required to be installed by the user, such as shutters. Option work includes conduit runs to be designed and installed around the lock to the control center within this building, to support future installation of a new control system under a separate contract. Other option work includes demolition of the existing control house after occupancy of the new control house. Design Work includes, but is not to, calculations, , and specifications. Included in the is the proper phasing of all activities coordinated among disciplines, and the removal of existing conditions to include utilities and occupants of the affected areas. The Contractor shall take into consideration that the existing structure will remain occupied during construction of new structure and phase demolition accordingly. must be signed and sealed by a Registered Architect, Registered Engineer, or other Registered , for the discipline of work required. must be in accordance with standards required within the contract. This contract will have a period of of 686 calendar . In accordance with FAR 36.204 -- Disclosure of the of Construction , the associated with this requirement is between $1,000,000.00 and $5,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$5,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2023
April 11, 2024
1217 Lock Ln, Moore Haven, FL
Related To This Project
Moore Haven, FL
Bid Date: Mar 04 2024
Moore Haven, FL
Bid Date: Mar 27 2024
Moore Haven, FL
Bid Date: May 15 2024
Moore Haven, FL
Bid Date: Jun 27 2024
Moore Haven, FL
Bid Date: Jul 11 2024
Moore Haven, FL
Bid Date: Aug 16 2024
Moore Haven, FL
Bid Date: Sep 17 2024
Moore Haven, FL
Bid Date: Jul 28 2023
Moore Haven, FL
Bid Date: May 01 2023
Moore Haven, FL
Bid Date: Mar 08 2023
Moore Haven, FL
Bid Date: Jun 22 2022
Moore Haven, FL
Bid Date: Jan 26 2024
Moore Haven, FL
Bid Date: Aug 25 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.