BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a military facility in Moore Haven, Florida. Working plans call for the construction of a 1,343-square-foot military facility; and for site work for a military facility.

As per Addendum 6 bid has been cancelled. The Jacksonville District Contracting Division has a requirement from the South Florida Operations Offices (SFOO) - Operations Division to provide a request for proposal for a of a Firm Fixed Priced (FFP) contract, utilizing Two-Phase Selection Procedures (See FAR 36.303). This FFP Contract is issued to obtain for a proposed new high sustainable lockhouse building. This building will serve as a lock and spillway control building for the Ortona Lock and Dam. This new building (approximately net conditioned 1,343 square feet including garage) is intended to house equipment that controls the operations of the lock and dam. The overarching building code is UFC 1-200-01 which has modifications and provisions to the International Building Code, however this building must also be designed as a High- Sustainable Building per UFC 1- 200-02, in particular Chapter 2. The building must be structurally and architecturally designed as a hurricane storm shelter in accordance with ICC 500. The structure including all openings must be inherently missile impact resistant without any additional protection required to be installed by the user, such as shutters. Option work includes conduit runs to be designed and installed around the lock to the control center within this building, to support future installation of a new control system under a separate contract. Other option work includes demolition of the existing control house after occupancy of the new control house. Design Work includes, but is not to, calculations, , and specifications. Included in the is the proper phasing of all activities coordinated among disciplines, and the removal of existing conditions to include utilities and occupants of the affected areas. The Contractor shall take into consideration that the existing structure will remain occupied during construction of new structure and phase demolition accordingly. must be signed and sealed by a Registered Architect, Registered Engineer, or other Registered , for the discipline of work required. must be in accordance with standards required within the contract. This contract will have a period of of 686 calendar . In accordance with FAR 36.204 -- Disclosure of the of Construction , the associated with this requirement is between $1,000,000.00 and $5,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$5,000,000.00

Public - Federal

New Construction, Site Work

32

22

15

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
82
Bidding Soon
1,351
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

April 11, 2024

img_map_placeholder

1217 Lock Ln, Moore Haven, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.