BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 1, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Edmonton, Alberta. Completed plans call for site work for a water / sewer project.

The intent of this RFP is to find a Successful Proponent for cable installation of new 1000 MCM AL EPR 15KV cables and removal of existing 1000 MCM AL EPR 15KV through existing underground infrastructure comprised of manholes, shafts, chamber and tunnel running underneath the North Saskatchewan River. The two access points are at manhole MN2240 located at the EL Smith Water Treatment Plant and manhole MS593 located at Terwillegar park. Documents can be obtained from https://epcor.bidsandtenders.ca/ Awarded value not released for publication.

Award

Water / Sewer

$100,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
34
Bidding Soon
512
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

October 17, 2023

Project location map

10 Rabbit Hill Rd NW, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.