BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Shaw AFB, South Carolina. Completed plans call for the renovation of a 7,875-square-foot military facility.

Work includes removing existing vinyl base, carpet and transitions and installing new carpet tiles, transitions and 4" vinyl base (see attached drawing). The contractor shall remove all furniture and equipment necessary to perform the installation and shall return upon completion in accordance with Statement of Work. Approx. carpet to be removed: 7,875 Square feet. Approx. carpet to be installed: 875 Square yard. Color choice is as follows: Carpet Mohawk Group: Art Exposure Collection Style: Adaptable Style number: BT432/QB432 Color name: 959 Slate. Deadline 08/23/2023 at 2:00 PM ET Description of Service/ of Work. The contractor shall furnish all labor, tools, materials,permits, and equipment necessary to perform the work noted below in B1122. Work includes removing existing vinyl base, carpet and transitions and installing new carpet tiles, transitions and 4" vinyl base. (see attached drawing). The contractor shall remove all furniture and equipment necessary to perform the installation and shall return upon completion. Contractor is responsible for ensuring the actual/correct amount of carpeting required. Color choice is as follows: Carpet Mohawk Group: Art Exposure Collection Style: Adaptable Style number: BT432/QB432 Color name: 959 Slate The Contractor shall relocate any additional furniture and equipment as required to complete the install. The Contractor is responsible for field measuring of carpet to ensure exact amount of carpet required to complete this installation. Installation includes delivery, uncarting, set up and debris removal. Work must be done within normal business hours 0730-1600 M-F unless coordinated with the user. The measurements given are an estimation. Offers shall include, but not be limited to: carpet, base, transitions and furniture relocation. Work includes removing existing vinyl base, carpet and transitions and installing new carpet tiles, transitions and 4" vinyl base (see attached drawing). The contractor shall remove all furniture and equipment necessary to perform the installation and shall return upon completion in accordance with Statement of Work. Approx. carpet to be removed: 7,875 Square feet. Approx. carpet to be installed: 875 Square yard

Post-Bid

Military

$36,332.00

Public - Federal

Renovation

3

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
100
Bidding Soon
1,134
All Active Projects
475
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 28, 2023

September 27, 2023

November 11, 2023

img_map_placeholder

To Be Determined, Shaw AFB, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.