BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Shaw AFB, South Carolina. Conceptual plans call for the renovation of a military facility.

The purpose of this sources sought submission is to gather information in support of Variable Refrigerant Flow HVAC Systems installation requirement. Request all interested parties answer the nine (9) questions available through the included (Survey Monkey) link below and questions in the attached document named Atch 2-Questionnaire-VRF HVAC System. PHASING: The demolition and construction of this project shall occur in four phases. Each phase will be determined by the VRF systems and the area of the building which they support. The contractor shall coordinate each phase and shutting down segments of the building with the government project inspector and Contracting Officer. DEMO: The contractor shall demolish the outdoor units. The contractor shall demolish the indoor heating/cooling distribution units. NEW WORK: The contractor shall install a new Trane/Mitsubishi or equal hybrid VRF system for each phase of the building. The branch selectors must be installed in a mechanical room. The contractor shall install water specialties (water make up, chemical make up) to support the new system. The contractor shall install Dedicated Outdoor Air System (DOAS) units in replacement of the Energy Recovery Ventilator units (ERV) and reuse the ERV ductwork for the DOAS supplementary air distribution. The interior of the reused ductwork shall be cleaned. An opening through the exterior wall will need to be created to connect one of the units. The contractor shall install a stand-alone HVAC system for the kitchen area. The new unit shall be ducted and the outdoor unit shall be installed on the existing pad located in the backyard. The existing ductwork can be reused. If the ductwork is reused the interior shall be cleaned. The contractor shall install new thermostats throughout the building and connect to a new master Building Automation and Control Network (BACNET) panel. The new panel shall be wired and programmed into the base Energy Management Control (EMCS) network. The contractor shall replace all outdoor refrigerant lines. The contractor shall insulate all new refrigerant and water lines. Any exterior lines shall be wrapped in aluminum jacketing. The contractor shall install drain condensate pumps on all wall mounted units as well as the indoor kitchen unit. The contractor shall check the drain lines for clogs and clear if necessary. The contractor shall install a new drain pan for the kitchen unit. The contractor shall provide new refrigerant for all systems. The contractor shall use the manufacturer for the start up of each phase. The contractor shall follow Shaw Design and Construction Standards. Contractor shall coordinate any HVAC and electrical outage with the government project inspector. Design set points for any new equipment must adhere to 76o inside temperature, 90o outdoor dry bulb temperature, 75o outdoor wet bulb temperature, and 25o outdoor winter temperature when applicable. Construction is expected to take approximately 308 calendar days. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

$300,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
51
Bidding Soon
612
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

img_map_placeholder

To Be Determined, Shaw AFB, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.