BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2024 at 8:00 PM

Updated March 31, 2024

Renovation of a military facility in Shaw AFB, South Carolina. Working plans call for the renovation of a military facility.

"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" This notice has been cancelled due to errors in the solicitation documents.A seperate solicitation is being prepared and will be published NLT 9 April 2024. ALCON: This requirement is being reposted as FA480324B0006. Please refer to the new solicitation for submission instructions. Bid due date will be 25 April 2024. A new solicitation and price worksheet will be attached. The new solicitation should be posted on or about 25 Mar 2024. Project Title: B1990 Elevator Modernization Constrn. Contr. No. N62467- 92-C-0905 Spec No: 06-92-0905 This requirement is to modernize the elevator for the control tower (building 1990) on Shaw Air Force Base, South Carolina. Work for this project includes replacing the existing control system, furnishing and installing a new overspeed governor and governor rope as well as car and counterweight roller guides. All work shall be performed in accordance with the Statement of Work. This award will be evaluated under Lowest Price Technically Acceptable (LPTA) procedures. The evaluation factors for technical acceptability include providing recent and relevant experience within the last 3 years. Additionally, your proposal shall include experience with open-access elevators with five (5) or more stops. These factors must be included in your proposal in order to be determined technically acceptable. A site visit is scheduled for this requirement and will take place on 7 March 2024 at 1:00 PM EST at building 1990 (Control Tower). If you require base access to Shaw AFB, please contact the COR for this requirement, Mr. David Adams at david.adams.57@us.af.mil, no later than COB 29 February 2024. Questions will be due by COB 12 March 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$500,000.00

Public - Federal

Renovation

4

21

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
92
Bidding Soon
989
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

September 30, 2024

Project location map

411 Polifka Dr, Shaw AFB, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.