Published December 28, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Oakland, California. Completed plans call for site work for a water / sewer project.

***As of November 16, 2023. Project has not been awarded yet. a Timeline for award has not been established yet. Work includes but is not limited to: demolishing and disposing of existing 11,000-gallon and 12,150-gallon polyethylene sodium hypochlorite (SHC) storage tanks, removing for salvage, and transporting a third 10,300-gallon polyethylene SHC storage tank to EBMUD's Oakport Storage Yard, located adjacent to the Oakport Wet Weather Facility (WWF), and demolishing and disposing of the associated piping and instrumentation associated with these SHC Tanks, as well as the three (3) reinforced concrete SHC tank foundations. Demolishing and disposing of approximately 200 linear feet of existing 3" CPVC temporary SHC feed system transfer pump discharge, and 6" PVC containment piping. Installing 3 new District-furnished 12,150-gallon fiberglass reinforced plastic (FRP) SHC storage tanks, concrete reinforced tank pads with a chemical-resistant coating, and associated piping and instrumentation. Piping work includes installing CPVC piping and associated valves and supports. Instrumentation work includes installing conduits and wiring, and radar-type level monitor elements and displays. An allowance is also included in the bid documents for work on locating and repairing leaks in the SHC tanks and pumps containment areas drain piping system, injection grouting cracks in the containment area slab, and recoating the containment area floor. Estimated Cost: $800,000 to $1,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A bidders bond for not less than 10% of the total bid dollar amount is required. Performance and payment bonds for not less than 100% of the contract price are required. All contract work shall be complete within 250 calendar days after receipt by the Contractor of the Notice to Proceed.

Award

Water / Sewer

$140,990.00

Public - County

Site Work

75

45

43

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
201
Bidding Soon
3,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.