Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in De Pere, Wisconsin. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of January 9, 2024, a contractor has not been awarded. This is a sources sought notice. A firm timeline for advertisement of a formal solicitation and start of construction has not been determined. *The closed solicitation has been included below for reference: EFFECTIVE NOVEMBER 17, 2023: The government seeks responses to Market Survey/Sources Sought for DePere Dam West Spillway Walkway Installation. Interested respondents shall provide their submittals prior to 3:30 p.m. (Central Time) on December 1, 2023. Negative replies are welcome. See below for complete details. By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the DePere Dam West Spillway Walkway Installation, De Pere, Brown County, Wisconsin. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of a RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party's expense. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFP, if any is issued. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this for additional information pertaining to this Notice. GOVERNMENT REQUIREMENTS: Under the planned contract, the contractor will be required to remove and replace the left spillway walkways and piers at DePere Dam, located in De Pere, Wisconsin. The work consists of removal and replacement of the seven steel walkway spans including superstructure and six reinforced concrete piers. Total walkway with railings length is approximately 350 feet. All interested Small Businesses, certified HUBZONE, 8(a), Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this market survey/sources sought via email no later than Friday, September 1, 2023 at 3:30 p.m. Central Time. Estimated Period: 720 calendar days under NAICS 237990 Other Heavy and Civil Engineering Construction Estimated Cost: Between $1,000,000.00 and $5,000,000.00 REQUESTED INFORMATION: 1. Identification and verification of the company's small business status. 2. Contractor's Unique Entity Identifier (UEI)) and CAGE Code(s). 3. Documentation from the firm's bonding company showing current single and aggregate and limits. 4. Description of Experience - Provide descriptions your firm's past experience up to three (3) projects with greater than 95% construction complete or those projects completed within the last five years which are similar to this project in size, and . Provide documentation demonstrating experience for construction of similar type structures and managing multiple sub-contractors. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, , dollar value, percentages and quality of . a. Projects similar in to this project included: Fabrication and installation of steel and concrete structures in a marine environment; coffer dam or other water control measures. b. Projects similar in size to this project include: Demolition, fabrication and installation of steel and concrete structures in a marine environment; use of water control methods. Construction contract greater than $1 million in total cost. c. Based on definitions above, for each project submitted include: i. Current percentage of construction complete and the date when it was or will be completed. ii. Size of the project iii. of the project iv. The dollar value of the construction contract v. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Must be at least 15% self-performed. vi. Whether the project was design build or design/bid/build vii. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm's own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Water / Sewer
$5,000,000.00
Public - Federal
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2024
To Be Determined, De Pere, WI
Related To This Project
De Pere, WI
Bid Date: Nov 02 2023
De Pere, WI
Bid Date: Nov 08 2023
De Pere, WI
Bid Date: Feb 13 2024
De Pere, WI
Bid Date: Feb 01 2024
De Pere, WI
Bid Date: Feb 01 2024
De Pere, WI
Bid Date: Feb 01 2024
De Pere, WI
Bid Date: Feb 01 2024
De Pere, WI
Bid Date: Apr 30 2020
De Pere, WI
Bid Date: Aug 21 2020
De Pere, WI
Bid Date: Jun 02 2022
De Pere, WI
Bid Date: Mar 30 2022
De Pere, WI
Bid Date: Mar 08 2022
De Pere, WI
Bid Date: Mar 10 2022
De Pere, WI
Bid Date: Feb 24 2022
De Pere, WI
Bid Date: Feb 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.