BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2023 at 7:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Braintree, Massachusetts. Completed plans call for site work for a water / sewer project.

PS-1 Common St. Pump Station Replacement Pump Pump shall be a 6" volute submersible Flygt pump (Model NP-3202.095) equipped with 460 Volt, 3 phase, 60 Hz/45 HP/1750 RPM motor, 462 impeller, 1 X 50 Ft. Length of SUBCAB 4G16+S(2x0,5) submersible cable, FLS leakage detector and volute is prepared for Flush Valve. All questions regarding this quote should be directed to Ryan Matheson, Engineering Manager by email to rmatheson@braintreema.gov.

Award

Water / Sewer

$43,660.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
308
Bidding Soon
4,009
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2023

October 20, 2023

Project location map

Common St, Braintree, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.