BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a water / sewer project.

The intent of this RFP is to find a Successful Proponent capable of providing the Work described immediately below. A more detailed description of the Work can be found in Appendix 1 (Information). The Project will be delivered using the methodology of Construction Management At Risk (CMAR). As such, the project is broken into two parts for the Construction Manager: Schedule “A” – Scope of Services – Pre-construction services, which includes but is not limited to: design assistance, estimating services, project scheduling, subcontractor bid documentation, project site planning and project site investigations, project opportunities for sustainability and procurement process. Schedule “B” – Preliminary Scope of Work – this work involves the construction of new sewer lines and the dry pond. This work is not guaranteed and is subject to funding approval, satisfactory completion of pre-construction services, accepted pricing, and other factors, as outlined in Appendix 1 (CMAR Contract). For phasing coordination, the Work has been grouped into several Lines, Pocket Park and the Pond Area. Some of the phasing considerations of the scope includes: Phasing to complete the Works ahead of the City of Edmonton's BGN (Building Great Neighborhoods) scope of work. Phasing the start of the dry pond impact to the U13 field to after the completion of the Kenilworth dry pond scope in 2024. Work around the school site to out of school periods. This is not a full list, and the requirements will be integrated into the construction schedule as part of the Pre-Construction Services noted in Schedule “A” The goals of delivering this project using CMAR is for EPCOR, the Consultant and Contractor to establish a collaborative, efficient and high performing team which meets the Project objectives and milestones. Of these, the emphasis for proceeding with this methodology is: Constructability and Execution Planning during Design in collaboration with Consultant and EPCOR Schedule Flexibility: Long Lead Equipment Procurement and Early Works in advance of IFC Timely and updated costing information The objective of the current project is to reduce the risk of flooding in the Ottewell and area neighbourhoods. The Ottewell neighbourhood is primarily serviced with a mix of combined sanitary and storm lines, and some separate storm lines. There is no stormwater management facility in the neighbourhood, and the current overland (or surface drainage system) is not effective. There are several areas in this neighbourhood where water can pool during intense rainfall events, which puts the area at a higher risk of flooding. To reduce the flood risk, EPCOR will be constructing a dry pond in Ottewell Park and installing/upgrading various storm infrastructure throughout the neighbourhood. The project is currently in the Preliminary Design Phase with construction anticipated to occur 2024 – 2026, with a potential for early Works in 2023. Documents can be obtained from https://epcor.bidsandtenders.ca/Module/

Post-Bid

Water / Sewer

$1,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
31
Bidding Soon
525
All Active Projects
170
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 16, 2023

December 11, 2023

img_map_placeholder

Multiple Locations, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.