Site work and renovation of a civil project in Eielson AFB, Alaska. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Contract Award Date: Sep 28, 2023 Contract Award Number: FA500423C0019 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JK2NRCHYK4N6 Contractor Awarded Name: Design Alaska, Inc. Contractor Awarded Address: Fairbanks, AK 99701 USA Base and All Options Value (Total Contract Value): $309,677.00 Repair Lift Station-FTQW 23-1401 Questions are due on Monday August 28, 2023 at 10 am Alaska Standard Time. Funds are not presently available for this effort. No award will be made under this synopsis/solicitation until funds are available. The Government reserves the right to cancel this notice, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. This notice is a synopsis/solicitation for Architect and Engineering services to be performed on Eielson AFB, Alaska. Please refer to the attached Project Synopsis and Solicitation Attachments for further instructions/details. **Please be sure to email both the Primary and Secondary POC's for any questions(As directed above)/ SF 330 submissions (General Information)** PROJECT TITLE: REPAIR LIFT STATION B2212 LOCATION: EIELSON AFB, ALASKA PROJECT: FTQW 231401 DESCRIPTION OF WORK: The purpose of this project is to design a secondary wet-well lift station to be utilized for bypass purposes. This station will be installed adjacent to the facility that houses the existing LS11A. The wet well will contain two inlets; one which originates from the sewer main (with an isolation valve), and another that comes from the existing LS-11A's wet well, roughly 10% of the well's capacity above the high-level alarm. It will include submersible sewage pumps w/grinding plates, a float system (Multi-Trode preferred), valves, controls, alarm system and piping. New lift station will be sized to meet anticipated peak demand. The SOW describes the Government's requirement for the design that will include: Connecting of electrical circuits for new controls to the existing LS-11A's generator to ensure uninterrupted operation; Connection of new pipes, valves, fittings, controls, etc. to new lift station and place into service, coordinating shutdowns as appropriate; Installation of a mechanical bar-screen on the inlet of the existing LS-11A with automated debris removal/collection bin; Extension of motor shaft on existing inline grinder pump (Muffin Monster) above the flood rim of LS-11A's wet well; Installation of one and a half inch (1-1/2") water supply line with an approved reduced pressure principal backflow assembly and hose reel in LS-11A's facility for cleaning/maintenance of bar-screen and wet-well areas; Repair of eroded/spauled out sections of LS-11A's wet well and line it with an approved epoxy coating; Expansion of LS-11A's wet well to accommodate a 900 GPM sewer pump to run for 2 minutes minimum. The "on" position for the lead pump is at approximately the 20-25% fill line of the wet well. This means that the total capacity of the well should be at least 7.2 to 9K gallons; Install a new level monitoring system for LS-11A; and installation of a conditioning pump in existing LS-11A wet well with all appurtenances to diminish the prolonged presence of sludge inside the well. The preferred systems would be a multi-trode or infrared system. Selection should be based on feasibility and expected performance. Estimated Project Cost is between $1,600,000 and $3,500,000 The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Water / Sewer

$3,500,000.00

Public - Federal

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
11
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

img_map_placeholder

To Be Determined, Eielson AFB, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.