BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Perry, Georgia. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

“The owner has selected a Construction Manager." Question Deadline 09/12/2023 The City of Perry (City) is seeking Proposals from qualified firms interested in providing Construction Manager at Risk (CMAR) services for a project known as the NORTHWEST SERVICE AREA GROUND STORAGE TANK AND BOOSTER PUMP STATION in Perry, Georgia (the Project). The project is located at the northwest corner of Georgia Hwy 341 and the Perry Bypass on the future Jack Links Processing Facility site. This facility is currently under construction. The Project includes material procurement and construction of a new 1,000,000 gallon ground storage tank and booster pump station that will include various pump sizes for fire flow and other system demands. The work includes as booster pump building, electrical and controls components, site work and grading, water mains to feed the tank and distribute water discharged from the booster pump station, and various interconnections with existing water mains. The CMAR will also be responsible for providing structural design for the tank and booster pump building that is stamped by a professional structural engineer in the State of Georgia. The CMAR will provide Preconstruction and Construction Phase Services in collaboration with the Engineer and Owner. The Project scope, design standards and performance requirements are described in more detail in Attachment D (Design Documents and Specifications). The Project scope, design standards and performance requirements are described in more detail in Attachment D (Design Documents and Specifications). The total budget for preconstruction and construction CMAR services for the proposed improvements is currently $5,000,000. The Project will be funded using local funds. Question Deadline 09/12/2023 GWES will act as the Owner Contact and shall administer the RFP process. All communications shall be submitted in writing, by email, and shall specifically reference this RFP. All questions or comments should be directed to the Owner Contact as follows: Burke Murph, PE GWES 733 Carroll Street, Perry, Georgia 31069 Email: burke.murph@gwesllc.com

Pre-Construction/Negotiated

Water / Sewer

$5,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
26
Bidding Soon
387
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

November 30, 2023

img_map_placeholder

Multiple Locations, Perry, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.