BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2024 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Warner Robins, Georgia. Contact the soliciting agency for additional information.

The Civil Engineering Mechanical and Electrical Multiple Award Construction Contract II (Mech/Elec II) is an indefinite delivery-indefinite quantity (IDIQ) contract whose requirements will be competed among a pool of multiple awardees. This solicitation is a 100% set-aside to HUBZone certified businesses. Work may include but is not limited to: maintenance, repair, and alteration of mechanical, electrical and electrical sub-systems, demolition, asbestos remediation, HVAC repairs/renovations/upgrades, HVAC DDC controls, hot water/chilled water/steam underground distribution, fuel distribution systems (underground lines and tanks), gas/electric/oil-fired boiler repairs/replacement, primary and secondary electrical, electrical repair/upgrades, generators repairs/replacements, airfield/interior/exterior lighting repair/renovations/upgrades, lightning protection systems, fire suppression, and fire alarm/mass notification system repairs/renovations/upgrades.. The contractor will furnish all design, labor, equipment, material, manufactured articles, transportation, supervision, and all else necessary to accomplish the design and/or repair/construction of each Task Orders written under this Mech/Elec II for all work that is defined for each project. Work will be accomplished at Robins AFB, GA. Task Orders will be completed as required per Mech/Elec II specifications, referenced documents, and as identified on any attached Task Orders project documents as applicable. A site visit will be scheduled to be held at Robins AFB on 14 December 2023 to allow Offerors the opportunity to survey the site prior to proposal submission. All offerors will meet at the Museum of Aviation Parking Lot @ 0830 to be escorted to the Site. Offeror RSVPs will be due NLT 29 November 2023 @ 1600hrs. After the Site Visit has been concluded, Offerors have the opportunity to Submit Requests for Information (RFI) to the Government. All RFI submissions are due NLT 20 December 2023 @ 1600hrs.

Post-Bid

Military

$500,000.00

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
86
Bidding Soon
870
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2024

February 19, 2024

Project location map

Multiple Locations, Warner Robins, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.