BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 7, 2025

Site work, remodeling and addition to an educational facility in Palatka, Florida. Completed plans call for the addition of a 11,000-square-foot educational facility.

As of January 21, 2025, in anticipation of new RFI Design Responses, the bid date has been extended to February 6, 2025. This project was previously called Multi-Function Floarts Facility on the Palatka Campus. The Florida School of the Arts project includes a $14.2 million remodel and addition to the existing FloArts building on the east side of campus, located off College Road. The 27,000 square foot remodel will enable new use opportunities and a transformative update to the existing theater, back-of-house, gallery, classroom and office spaces. The 11,000 square-foot addition includes a central lobby with new classrooms, collaboration and event spaces that will unify the North and South wings of the existing building. A blackbox theater addition to the north side of the building will be equipped with state-of-the-art technology and will provide students with a new range of performance and learning opportunities. Trades Required: SITE: Selective Demolition, Sitework STRUCTURE: Cast-in Place Concrete, Structural Steel, Ornamental Metals SYSTEMS: Fire Protection, Plumbing, HVAC, Electrical, Data/Communications, Audio/Visual, Security/Access Control SKIN: Waterproofing, Roofing, Metal Wall Panels, Doors, Storefront & Glazing, Metal Stud & Drywall/Plastering, EIFS SURFACES: Casework, Acoustical Ceilings, Painting & Wall Coverings, Flooring SPECIALTIES: Toilet Accessories, Signage, Window Coverings, Fixed Seating Although a firm timeline has not been confirmed, construction is not expected to start prior to first quarter 2025. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Post-Bid

Educational

$14,200,000.00

Public - State/Provincial

Addition, Remodeling, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

211

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
115
Bidding Soon
1,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 28, 2025

Project location map

5001 St Johns Ave, Palatka, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.