BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Surrey, British Columbia. Contact the soliciting agency for additional information.

1. Manufacture/assembly and testing of the Model 352i traffic signal cabinet supplied with an anodized finish, shall comply fully with ATC 5301 v02.02, (Advanced Transportation Controller ["ATC"]), published on March 18, 2019, or the most recent version, with the following exceptions or additions: a. Voltage - The Model 352i traffic signal cabinet shall be the High Voltage (HV) version, capable of operation on traditional 120 VAC service voltage to control 120 VAC low power (non-incandescent) signal heads. b. Input Assembly (IA) - 48ch IA shall include: i. (1) Single 3U 48 channel input rack ii. (2) SIU Model 2218 iii. (12) 4 channel detectors (Model EDI LMD624H). c. Field Input Termination Assembly (FITA)- 48ch FITA shall include: i. 48 Channel Termination Assembly ii. (24) 10-postion phoenix contact terminal block and sockets. d. Output Assembly (OA) - 16-channel output assembly rack shall include: i. (1) SIU Model 2218 ii. (8) Model 2202 HV High Density Switch Pack/Flasher Unit (HDSP/FU), iii. Stop Time Switch, Flash / Auto Switch, four 5A Circuit Breakers and Momentary 24 Vdc Bypass button. iv. 48VDC Main contactor. The main contactor shall not be installed externally where accidental touch can occur. e. Field Output Termination Assembly (FOTA) - 16ch FOTA shall include: i. 16 Channel Termination Assembly ii. (16) 6 Position, Colour-coded (RR-YY-GG), push in style phoenix connector iii. (8) HESCO, #HE103C-9 Suppressors. f. Cabinet Monitor Unit - (1) 2212-HV CMU: 32 channel capability with Ethernet for 120 VAC cabinets, complete with EDI Auxiliary Display Unit (ADU) Model ADU-2220. All inquiries related to this RFQ should be directed in writing. The City reserves the right not to respond to inquiries made within 7 business days of the Date set out in Section 3. Inquiries and responses will be recorded and may be distributed to all Contractors at the discretion of the City.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
64
Bidding Soon
2,125
All Active Projects
768
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.