BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a clubhouse / community center in Flat Rock, North Carolina. Completed plans call for the construction of a 4,727-square-foot, one-story above grade clubhouse / community center.

It is understood that the proposed greenhouse will preliminarily have a footprint on the order of 120 feet by 60 feet. The type of construction is unknown at this time. The structure is anticipated to be supported by bearing walls and/or columns with maximum loads estimated at 2,000 pounds per lineal foot for walls and 25 kips for columns. We have assumed a slab-on-grade with a maximum 100 pounds per square foot live load. Greenhouse Lab and Restroom construction. The Owner reserves the unqualified right to reject any and all proposals. Signed: Mr. Marshall Morris Capital Projects Coordinator, Blue Ridge Community College. Plans available for inspection from September 5th, 2023. The check shall be made out to Clark Nilsen. General Contractors may obtain 2 sets on deposit, Mechanical, Electrical, and Plumbing may obtain 1 set on deposit. The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within ten (10) days after the bid date. This meeting is mandatory for general contractors. General contractors not in attendance at this meeting will not be allowed to submit a proposal. The meeting will address project specific questions, issues, bidding procedures and bid forms. This is also an open meeting for presentation of performance standards for owner preferred brand alternates.

Bid Results

Clubhouse / Community Centers

$1,950,000.00

Public - State/Provincial

New Construction

41

30

15

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
105
Bidding Soon
1,199
All Active Projects
509
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 11, 2023

December 4, 2023

September 9, 2024

img_map_placeholder

300 E Campus Dr, Flat Rock, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.