Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Birchwood, Wisconsin. Completed plans call for site work for a water / sewer project.
Village of Birchwood Water Tower Rehabilitation The work for which bids are asked includes the following: Repainting of an existing 60,000 gallon, single-pedestal, elevated water tank including complete removal and replacement of the wet interior surfaces and exterior surfaces. The work will require the installation of a temporary containment system and temporary water pressure system and will also include miscellaneous structural and electrical improvements. The work shall be substantially complete within 40 calendar days of the draining of the water tower and no later than September 30, 2024. Final completion shall be within 70 calendar days of the draining of the water tower and no later than October 30, 2024. 2024. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 11 East Marshall Street, Suite 201, Rice Lake, WI 54868. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at electronically. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at electronically. OWNER reserves the right to waive any informalities or to reject any or all bids.
Award
Water / Sewer
$505,600.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2023
November 6, 2023
W Cedar Ave & S Vance St, Birchwood, WI
Related To This Project
Birchwood, WI
Bid Date: Aug 06 2024
Birchwood, WI
Bid Date: Aug 06 2024
Birchwood, WI
Bid Date: Aug 06 2024
Birchwood, WI
Bid Date: Aug 16 2024
Birchwood, WI
Bid Date: Apr 27 2023
Birchwood, WI
Bid Date: Jul 21 2022
Birchwood, WI
Bid Date: Jun 13 2022
Birchwood, WI
Bid Date: Oct 06 2022
Oconto Falls, WI
Bid Date: Aug 30 2023
Madison, WI
Bid Date: Aug 24 2023
Rhinelander, WI
--
Reedsburg, WI
Bid Date: Sep 18 2023
Stevens Point, WI
Bid Date: Sep 18 2023
Pewaukee, WI
Bid Date: Sep 14 2023
Madison, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.