BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Kirksville, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Factory Addition, is located in an older subdivision of town that is relatively flat. Initially developed in 1908 for the Freidman Shelby Shoe Factory, modest homes were built on small lots and the streets were not built for the volume and weight of today`s traffic. In recent years the project area has seen substantial residential development and larger homes are being built to replace existing structures, including wider driveways. A survey conducted in 2019 showed great need for curb and guttering, roadway reconstruction, and storm drainage improvements. The City applied for and was awarded a CDBG grant in the amount of $0.5 million to complete this work. This project is included in the city’s 2024-2028 Capital Improvement Plan. As of March 19, 2024, project funded for FY2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,610,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
21
Bidding Soon
201
All Active Projects
82
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

img_map_placeholder

To Be Determined, Kirksville, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.