BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 28, 2023 at 7:00 PM

Updated February 24, 2024

Site work and paving for a bridge / tunnel in Mount Tabor, Vermont. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Location: Mt. Tabor Vtry(35)(Re-Ad) - Vtr Bridge No. 83 Over Mill Brook at Mile Post 36.35 in Mount Tabor. Wallingford Vtry(39)(Re-Ad) - Vtry Bridge No. 88 Over Otter Creek Type of Construction: Mt. Tabor Vtry(35) (Re-ad) - Rehabilitation of Existing Structure by Strengthening Interior Floor Beams Removal and Replacement of Timber Pedestals and Concrete Backwalls, Bridge Seats and Wingwalls With Precast Concrete. Reconstruction of Approaches. Wallingford Vtry(39) (Re-ad) - Bearing Replacement; Replacement of Abutment and Pier Bearing Seats; Replacement of Abutment Backwalls; Rivet Replacement; Install Retaining Structure Bid Bond: Electronic bid bond to be submitted in the amount of 5% of the Contractor's bid. For this proposal the Engineer's Estimate is Category E $2,500,000 - $5,000,000 All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the Contractor's Experience Questionnaire and Financial Statement And Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form During the advertisement period, all questions shall be addressed solely to the Office of Contract Administration via email: AOT.ConstructionContractingInquiry@vermont.gov. All inquiries must be received by 4:30pm on Wednesday, December 06, 2023.. This Contract shall be completed on or before May 23, 2025 The right is reserved to reject any or all bids, to waive any formality, and any and all technicalities in bids, and to accept such bids as may be deemed in the best interest of the awarding agency. VT DOT - Mt. Tabor Vtry(35) (Re-Ad) and Wallingford Vtry(39) (Re-Ad) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$4,707,359.00

Public - State/Provincial

Paving, Site Work

17

5

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
105
Bidding Soon
1,455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2023

February 15, 2024

Project location map

Multiple Locations, Mount Tabor, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.