Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a stadium in High River, Alberta. Completed plans call for the renovation of a stadium.
The successful proponent will have total control over the Design Services and Construction of the Work for the Bob Snodgrass Recreation Complex Large Arena Slab Replacement Project. At a minimum, the scope of work for the "Large Arena Slab Replacement" project includes: Design, supply and installation of functional: Existing header and header trench demolition Existing slab and cooling line demolition. Equipment and components required to install the large arena slab New refrigeration header with capability to independently operate arena sheet New below slab heating system Barrier-free accessibility to ice surfaces Ice sheets Replace existing snow melt pit grating with new grating c/w pneumatic open/close operation. Controls for pneumatic operation to be accessible while seated in ice re-surfacer. Pedestrian and worker warning system to be developed and installed for instances while the ice pit is in "open" position. Retain the services of a qualified geotechnical firm to conduct a geotechnical study to determine the soil and groundwater conditions under the large arena slab and confirm the extent of remediation required for support of the new slab. Previous geotechnical investigation reports conducted at the facility are included Appendix F Reinstallation/modification of plexiglass and arena dasher boards to accommodate new design. Reinstallation of netting. All site work must be completed during off season between the 2023/2024 and 2024/2025 hockey seasons.
Award
Arenas / Stadiums
$1,059,943.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2023
November 14, 2023
228 12 Ave SE, High River, AB
Related To This Project
High River, AB
Bid Date: Jan 04 2022
High River, AB
Bid Date: Dec 20 2021
High River, AB
Bid Date: Jan 20 2022
High River, AB
Bid Date: Feb 24 2022
High River, AB
--
High River, AB
Bid Date: Mar 15 2022
High River, AB
Bid Date: Jul 27 2020
High River, AB
Bid Date: Mar 10 2022
High River, AB
Bid Date: Aug 24 2023
High River, AB
Bid Date: Jul 27 2023
High River, AB
Bid Date: Jul 18 2023
High River, AB
Bid Date: Jun 13 2023
High River, AB
Bid Date: May 31 2023
High River, AB
Bid Date: May 30 2023
High River, AB
Bid Date: May 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.