Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 1, 2023 at 8:00 PM
Updated January 27, 2024
Site work and paving for a road / highway in Ojai, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of November 1, 2023, project was awarded to Toro Enterprises, Inc, awarded amount is $306,272.50.** The Ojai Valley Trail Paving Project consists of a 3-inch grind and overlay of the existing asphalt concrete pavement on the Ojai Valley Bike Trail, the grading and recompacting of the Ojai Valley Horse Trail (parallel to the Bike Trail), and associated improvements. The Contract Work will be performed on the County of Ventura Ojai Valley Bike/Equestrian Trail. The Work involves performing a 3-inch-thick pavement grind and installation of a replacement 3- inch-thick overlay of 25,100 sf of the existing asphalt concrete pavement on the Ojai Valley Bike Trail, the grading and recompacting of 22,310 sf of the Ojai Valley Horse Trail, and associated improvements. The Engineer's Estimate is approximately $350,000. LOCATION OF WORK The Site is located on the Ojai Valley Bike Trail on County of Ventura owned parcels 061-0-150- 185 (trail), unincorporated Ventura County (Oak View), California. Unless otherwise defined herein, capitalized terms used in this Notice Inviting Bids shall have the same meaning given to them in the "General Conditions" adopted by the District. Each Bidder must submit all of the items described in the Instructions to Bidders provided by the District (the "Instructions to Bidders") and all of those items shall collectively constitute the "Bid." Each Bid must be accompanied by cash, a certified or cashier's check or by a Bidder's bond as described in the Instructions to Bidders (the "Bidder's Security") as a guaranty that the Bidder shall, if awarded the Contract, (i) execute the Contract in accordance with the Bid as accepted by the District, (ii) furnish the required payment and performance bonds and bonding company documentation, (iii) provide satisfactory evidence that the Bidder's Project Manager, and all other designated employees meet the experience and certification requirements in this Notice Inviting Bids, and (iv) provide satisfactory evidence that all required insurance coverages have been secured. The Bidder's Security shall be in an amount that is at least ten percent (10%) of the aggregate amount of the Bidder's Bid. Completion of all Work 45 Working Days
Award
Roads / Highways
$289,323.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 12, 2023
November 13, 2023
Ojai Vly Trl, Ojai, CA
Related To This Project
Ojai, CA
Bid Date: Oct 05 2023
Ojai, CA
Bid Date: Oct 12 2023
Ojai, CA
Bid Date: Dec 08 2021
Ojai, CA
Bid Date: Feb 09 2022
Ojai, CA
Bid Date: Mar 11 2022
Ojai, CA
Bid Date: Dec 06 2023
Ojai, CA
Bid Date: Aug 18 2023
Ojai, CA
Bid Date: Jun 23 2023
Ojai, CA
Bid Date: May 25 2023
Ojai, CA
Bid Date: Apr 19 2023
Ojai, CA
Bid Date: Sep 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
