Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Enid, Oklahoma. Contact the soliciting agency for additional information.
ADDENDUM 2 Questions and Answers uploaded in attachments Response date remains the same as October 6, 2023 @ 11:00 am This is a Free and Open Sources Sought notice for A-E Services for providing two Charrette Reports (CR) for Renovate Officer Unaccompained Housing B713 and B714. Sources Sought Notice- A-E Services for providing two Charrette Reports. Prove a Charrette Report (CR) for RENOVATE OFFICER UNACCOMPANIED HOUSING, B713 and a Charrette Report for RENOVATE OFFICE UNACCOMPANIED HOUSE, B714 at Vance AFB, Oklahoma SYNOPSIS: THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NEITHER THE GOVERNMENT NOR ASRC FEDERAL FIELD SERVICES (AFFS) WILL PAY OR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT AND AFFS IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. Arctic Slope Regional Corporation Federal Field Services, AFFS, is seeking a qualified design firm in the Architect-Engineering industry to develop Charrette Reports (CR) for the following projects: CR for Renovate Officer Unaccompanied Housing, B713, (XTLF 31-1009CR) and CR for Renovate Officer Unaccompanied Housing, B714, (XTLF28-1013CR). This requirement is being procured in accordance with the Brooks Act as implemented in FAR 36.6. Applicable NAICS is 5413, Architectural, Engineering, and Related Services. This is a free and open Sources Sought Notice. All firms will be required to submit SF330 for this Sources Sought Notice. SCOPE OF SERVICE REQUIRED: Refer to Appendix 1 - Statement of Work. TYPE OF CONTRACT CONTEMPLATED: AFFS is contemplating awarding a firm fixed price contract . Only A-E Teams responding to this solicitation and found to be qualified will be considered for the award of the design project. ESTIMATED START AND COMPLETION DATES: The estimated start date via a notice to proceed (NTP) is during late Fall 2023. The period of performance from the date of the NTP is 241 Calendar Days. The qualified firm must perform the work required within the limits of the agreed to schedule. Professional architects, engineers, and related design disciplines familiar with work may be directed to attend in-person, on-site milestone meetings as well as to conduct some milestone meetings as teleconferences. See Appendix 1 - Statement of Work for more information regarding project milestones. RESPONSE TO SOLICIATION SUBMISSION REQUIREMENTS: A-E Teams will be selected in accordance with FAR section 36.602-1. A-E Teams must submit a SF330 package of qualifications for review by ASFF and approved by Vance AFB Government Personnel. AFFS shall evaluate each potential A-E Team in terms of its: 1) Professional qualifications necessary for satisfactory performance of required services; 2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and use of recovered materials; 3) Capacity to accomplish the work in the required time; 4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; 5) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. AFFS will consider the general geographical area to be approximately 300 miles. 6) Acceptability under the other appropriate evaluation criteria. The SF330,parts A thru G should be limited to 20 numbered pages of easily readable text (size 11 font), graphics and pictures. An appendix with supporting documentation may also be included, is not limited in length, and is not required. SELECTION PROCESS: The intent of the AFFS and A-E Team arrangement is to facilitate the timely, transparent, and efficient teaming between the A-E Team and AFFS to meet the needs of Vance AFB. Within two weeks of receipt of SF330 packages, a committee comprised of AFFS staff architects, engineers, and leadership will review the package according to FAR 36.602-2 thru 36.602-5. A short list of firms will be selected, based on the judgement of the committee and number of interested sources. Submissions will be ranked in the following manner: 1) Submissions will be evaluated based on stated services in the SF330. 2) Each committee member will independently review the SF330s and rank the suitability for each A-E Team based on the submission requirements listed above. 3) The committee will meet, and by consensus agree to the rankings of the highest qualified A-E Team for the project based on the provided information in the SF330. 4) The rankings will be shared with the 71st ISS/CE Flight representatives. With concurrence, AFFS Local Purchase will begin negotiating a fee for the project. 5) Upon conclusion of the fee negotiations, the A-E Team will proceed with the design process in accordance with Appendix 1 and at the direction of the AFFS managing Architect or Engineer. To be Eligible for award, registration with the System for Award Management (SAM) must be current. To register or update go to www.sam.gov. APPENDIX 1 Statement of Work A Question and Answer form is attached and all questions will need to be listed on the form and emailed to shari.lamunyon.ctr@us.af.mil and betty.kliewer.ctr@us.af.mil NLT Sept.15, 2023 3:00 PM. All Interested Firms will need to have their packets emailed to shari.lamunyon.ctr@us.af.mil and betty.kliewer.ctr@us.af.mil NLT than October 6, 2023: 11:00 AM (CST). LATE RESPONSES WILL NOT BE ACCEPTED. The method of Contractor Selection has not been Determined at this time.
Conceptual
Military
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2024
Multiple Locations, Enid, OK
Related To This Project
Enid, OK
Bid Date: Oct 20 2021
Enid, OK
Bid Date: Jan 05 2022
Enid, OK
Bid Date: Nov 11 2021
Enid, OK
Bid Date: Sep 16 2021
Enid, OK
Bid Date: Sep 16 2021
Enid, OK
Bid Date: Jun 24 2021
Enid, OK
Bid Date: Jan 17 2022
Enid, OK
Bid Date: Feb 24 2022
Enid, OK
Bid Date: Oct 02 2023
Enid, OK
Bid Date: Aug 16 2021
Enid, OK
Bid Date: Jun 03 2024
Enid, OK
Bid Date: Aug 31 2023
Enid, OK
Bid Date: Aug 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.