BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Keystone, Colorado. Contact the soliciting agency for additional information.

BLM CO-WRFO SPRING GULCH 1-22 WELL AIR MONITORING This modification is to extend the offer date to September 11, 2023, 1700 MT. This is a solicitation for methane air quality monitoring at Spring Gulch in accordance with the terms and conditions of your Bipartisan Infrastructure Law Federal Orphaned Well Program Support Services IDIQ and the attachments. This award will be made based off of Lowest-Price Technically Acceptable (LPTA) as detailed in FAR 15.101-2. The LPTA process is a simplified best value source selection strategy that permits the best value to result from the selection of the technically acceptable proposal with the lowest price. While evaluating quotes utilizing LPTA, price and technical are the two evaluation factors. Price and Technical Acceptability when evaluated are weighted equally. If the lowest priced evaluated is considered a technically acceptable offer that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers. If the lowest priced offeror is not considered technically acceptable, the next lowest priced offeror will be evaluated and the process will continue (in order by price) until an offeror is determined to be technically acceptable or until all offerors are evaluated. The Contracting Officer shall then make an integrated assessment best value award decision. Evaluation Factors Evaluation Approach. Price Reasonableness Evaluation. The offeror's Price Quote will be evaluated based upon the total price proposed. Price will be ranked from lowest to highest price. Technical Qualifications. Technical submissions will be evaluated utilizing as shown below. Acceptable Information provided demonstrates the offeror has the technical know-how to meet the requirements of the solicitation. Unacceptable Information provided does not demonstrates the offeror has the technical know-how to meet the requirements of the solicitation. Vendor Responsibility. Federal Databases such as FAPIIS/CPARS will be utilized. Information recorded in FAPIIS and SAM and will be used to determine a contractor's responsibility. The evaluation process shall proceed as follows. Period of Performance: 09/15/2023 to 06/30/2024

Post-Bid

Water / Sewer

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
71
Bidding Soon
987
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

September 15, 2023

img_map_placeholder

Multiple Locations, Keystone, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.