BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Burton, Michigan. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

Sealed Bids for Bristol Road Rehabilitation and Culvert Replacements The issuing Office for the Bidding Documents is the office of the ENGINEER, Orchard, Hiltz, & McCliment, Inc., d/b/a OHM Advisors The approximate quantities of major items of work involved are as follows: 1.05 miles of pavement rehabilitation along Bristol Road and Vassar Road including rubblizing and overlaying concrete sections, full depth pavement removal and replacement, HMA cold milling composite sections, pavement markings, signage, and three culvert replacements; one on Bristol Road at Gilkey Creek within the road rehabilitation limits, one immediately downstream on Bellingham Ct., and one on Bristol Road west of the road rehabilitation limits and east of Center Rd. The Road Rehabilitation Work will be substantially completed on or before June 23, 2024, and completed and ready for final payment on or before July 24, 2024. Bid Security in the form of a Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid. The OWNER reserves the right to accept any Bid, reject any Bid, or waive irregularities in Bids Contractor will be required to furnish performance and payment bonds each equal to one-hundred percent (100%) of the Contract Sum. The bonds shall be the OWNERs guarantee of the faithful performance and payment of all the Contractors obligations under the Agreement. These bonds shall remain in effect for the period as stated in each bonds provisions. No Bid may be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receipt of the Bids. No pre-bid meetings are scheduled for this project.

Bid Results

Roads / Highways

$2,140,622.00

Public - City

Paving, Site Work

46

7

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
170
Bidding Soon
2,352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2023

November 1, 2023

Project location map

Bristol Rd, Burton, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.