Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 9, 2025 at 8:00 PM
Updated November 14, 2025
Site work and paving for a transportation facility in Clinton, Iowa. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Traffic control, construction staking, topsoil strip, salvage and spread, excavation, pavement removal, underdrain, geogrid, aggregate basecourse, PCC Pavement, aircraft tiedown/mooring eye installation, pavement marking, SWPPP Preparation and management, erosion control, seeding, electrical light pole installation and other miscellaneous construction. Question Deadline 03/05/2025 The last day for questions will be Wednesday Each bid shall be accompanied by a Bid Bond in an amount equal to five (5%) of the total amount of the bid. Bid Bonds must be on the form provided with the Contract Documents. The Certified Check, Certified Share Draft or Cashier's Check shall be drawn on a bank or Credit Union in Iowa or a bank or Credit Union chartered under the laws of the United States of America and payable to the Clinton Airport Commission as security that if awarded a contract, the bidder will enter into a contract at the prices bid and furnish the required performance and payment bonds and certificates of Insurance. The Certified Check, Certified Share Draft or Cashier's Check may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the bidder fails to execute a contract or file acceptable performance bonds or provide an acceptable certificate of insurance within fifteen (15) calendar days after the acceptance of his proposal by resolution of the Clinton Airport Commission. No bidder may withdraw a proposal within ninety (90) days after the date set for opening bids. All Contractor(s) and subcontractor(s) are required to obtain tax exemption certificates from the Clinton Airport Commission, for this project. These tax exemption certificates are only for use on this specific project as covered under the Contract. Before final payment will be made on this project, the Contractor(s) and subcontractor(s) shall provide lien waivers as required in the Specifications. Phase 1 Construct North Apron (Phase 2) 50 Calendar Days $1,000.00 / Day Project Closeout Final Inspection 14 Calendar Days $250.00 / Day This project is subject to the requirements of Target Small Business Affirmative Action Responsibilities on Non Federal Aid Projects. The owner has established a contract goal of 1.51% percent participation for small business concerns owned and controlled by qualified Target Small Business (TSB). The bidder shall make and document good faith efforts, as defined in section 7C of the TSB Contract provisions prior to the contract award. The right is reserved, as the Clinton Airport Commission may require, to reject any and all bids and to waive any informality in the bids received. The owner has established a contract goal of 1.51% percent participation for small business concerns owned and controlled by qualified Target Small Business (TSB).
Award
Transportation Terminals
$258,703.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 7, 2025
2000 S 60th St, Clinton, IA
Related To This Project
Clinton, IA
Bid Date: Mar 10 2025
Clinton, IA
Bid Date: Apr 08 2025
Clinton, IA
Bid Date: Apr 14 2025
Clinton, IA
Bid Date: Jul 09 2025
Clinton, IA
Bid Date: May 08 2025
Clinton, IA
Bid Date: Jul 09 2025
Clinton, IA
Bid Date: Jul 18 2025
Clinton, IA
Bid Date: Jul 17 2025
Clinton, IA
Bid Date: Feb 19 2025
Clinton, IA
Bid Date: Mar 11 2025
Clinton, IA
Bid Date: Mar 04 2025
Clinton, IA
Bid Date: Feb 27 2025
Clinton, IA
Bid Date: Feb 04 2025
Clinton, IA
Bid Date: Jan 20 2025
Clinton, IA
Bid Date: Jul 23 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
