BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Cut Off, Louisiana. Completed plans call for the renovation of a educational facility.

Renovations to Kitchen Drain Lines. Each bid shall be accompanied by a bid security of not less than five (5%) percent of the total bid amount. Said amount shall be in the form of a Bid Bond, Certified Check, or Cashiers Check drawn on a bank insured by the Federal Deposit Insurance Corporation payable to the Special Education District No. 1. The successful lowest responsible and responsive bidder shall be required to furnish the Owner with a performance bond for 100% of the contract amount prior to the issuance of a contract to perform the work. All questions from bidders shall be submitted by email to dino@ghcarchitects.com. All questions sent by email shall have the project name in the subject area of the email. The last day to submit questions from the Mandatory Pre-bid Conference on this project is WEDNESDAY, OCTOBER 16, 2023, at 5:00 PM. The response to questions shall be WEDNESDAY, OCTOBER 18, 2023. No bid may be withdrawn for a period of 45 days after receipt of bids. The sign-in sheet shall have an area to fill in the signature of the person representing a contractor, the company being represented, the Louisiana license number of the contractor, phone and fax number of the Contractor, and an email address of the Contractor. The Architect prefers that all of the five above items be filled out at the mandatory pre-bid. (The information required may be emailed to our office before or 24 hrs. after the Mandatory Pre-Bid at dino@ghcarchitects.com. Emailing this information to our office shall not relieve the contractor of the requirement to be represented at the Mandatory Pre-Bid Conference.) The sign-in sheet shall be collected by the design professional prior to the completion of the meeting. Contractors shall not be allowed to sign the sign-in sheet after it is collected by the design professional. Contractors shall also be required to sign the sign-out sheet after the entire pre-bid conference is complete. (All Contractors shall sign the sign-in sheet and the sign-out sheet in order to bid this project.) The time of completion of this project is prime importance. The Bidder agrees to commence work under this contract not later than the date indicated in the Owners written Notice to Proceed. All of the work required shall be completed within 60 calendar days from the Notice to Proceed. Should the Contractor neglect, refuse or fail to complete the work on the amount of calendar days indicated above, the Owner shall have the right to deduct from and retain out of such moneys which may be due or which may become due and payable to the Contractor, as indicated in Article 9 of the Instructions to Bidders for each and every day that such completion of the work is delayed beyond the prescribed date / calendar days, as liquidated damages and not as a penalty. If the amount due and to become due from the owner to the Contractor is insufficient to pay in full any such liquidated damages, the contractor shall pay the owner the amount necessary to affect such payment in full. Provided, however, that the Owner shall promptly notify the Contractor in writing of the manner in which the amount retained, deducted, or claimed as liquidated damages was computed. Designer will be paid for prolonged contract administration and observation of construction should the contract time, as may be extended, be exceeded due to no fault of the Designer and liquidated damages are recommended by the Designer. The amount of such payment shall be computed by dividing 20% of the basic total fee by the number of days construction time, as extended to the contractural completion date, and multiplying by the number of days of liquidated damages recommended by the Designer. The Designers prolonged contract administration shall be compensated by deducting from moneys which may become due and payable to the Contractor. Bids must be submitted on the Louisiana Uniform Public Works Bid Form furnished with the Bidding Documents. Bid sheets will be issued only to Contractors and/or Subcontractors licensed in accordance with the provisions of R.S. 37:2150 through 2173 of the Louisiana Legislature. Contractors desiring to bid shall submit their Louisiana Contractors License Number as evidence that they hold a license for BUILDING CONSTRUCTION that is in full force and effect.

Post-Bid

Educational

$300,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
28
Bidding Soon
451
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

November 27, 2023

img_map_placeholder

To Be Determined, Cut Off, LA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.