Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Cut Off, Louisiana. Completed plans call for the renovation of a educational facility.
Renovations to Kitchen Drain Lines. Each bid shall be accompanied by a bid security of not less than five (5%) percent of the total bid amount. Said amount shall be in the form of a Bid Bond, Certified Check, or Cashiers Check drawn on a bank insured by the Federal Deposit Insurance Corporation payable to the Special Education District No. 1. The successful lowest responsible and responsive bidder shall be required to furnish the Owner with a performance bond for 100% of the contract amount prior to the issuance of a contract to perform the work. All questions from bidders shall be submitted by email to dino@ghcarchitects.com. All questions sent by email shall have the project name in the subject area of the email. The last day to submit questions from the Mandatory Pre-bid Conference on this project is WEDNESDAY, OCTOBER 16, 2023, at 5:00 PM. The response to questions shall be WEDNESDAY, OCTOBER 18, 2023. No bid may be withdrawn for a period of 45 days after receipt of bids. The sign-in sheet shall have an area to fill in the signature of the person representing a contractor, the company being represented, the Louisiana license number of the contractor, phone and fax number of the Contractor, and an email address of the Contractor. The Architect prefers that all of the five above items be filled out at the mandatory pre-bid. (The information required may be emailed to our office before or 24 hrs. after the Mandatory Pre-Bid at dino@ghcarchitects.com. Emailing this information to our office shall not relieve the contractor of the requirement to be represented at the Mandatory Pre-Bid Conference.) The sign-in sheet shall be collected by the design professional prior to the completion of the meeting. Contractors shall not be allowed to sign the sign-in sheet after it is collected by the design professional. Contractors shall also be required to sign the sign-out sheet after the entire pre-bid conference is complete. (All Contractors shall sign the sign-in sheet and the sign-out sheet in order to bid this project.) The time of completion of this project is prime importance. The Bidder agrees to commence work under this contract not later than the date indicated in the Owners written Notice to Proceed. All of the work required shall be completed within 60 calendar days from the Notice to Proceed. Should the Contractor neglect, refuse or fail to complete the work on the amount of calendar days indicated above, the Owner shall have the right to deduct from and retain out of such moneys which may be due or which may become due and payable to the Contractor, as indicated in Article 9 of the Instructions to Bidders for each and every day that such completion of the work is delayed beyond the prescribed date / calendar days, as liquidated damages and not as a penalty. If the amount due and to become due from the owner to the Contractor is insufficient to pay in full any such liquidated damages, the contractor shall pay the owner the amount necessary to affect such payment in full. Provided, however, that the Owner shall promptly notify the Contractor in writing of the manner in which the amount retained, deducted, or claimed as liquidated damages was computed. Designer will be paid for prolonged contract administration and observation of construction should the contract time, as may be extended, be exceeded due to no fault of the Designer and liquidated damages are recommended by the Designer. The amount of such payment shall be computed by dividing 20% of the basic total fee by the number of days construction time, as extended to the contractural completion date, and multiplying by the number of days of liquidated damages recommended by the Designer. The Designers prolonged contract administration shall be compensated by deducting from moneys which may become due and payable to the Contractor. Bids must be submitted on the Louisiana Uniform Public Works Bid Form furnished with the Bidding Documents. Bid sheets will be issued only to Contractors and/or Subcontractors licensed in accordance with the provisions of R.S. 37:2150 through 2173 of the Louisiana Legislature. Contractors desiring to bid shall submit their Louisiana Contractors License Number as evidence that they hold a license for BUILDING CONSTRUCTION that is in full force and effect.
Post-Bid
Educational
$300,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2023
November 27, 2023
To Be Determined, Cut Off, LA
Related To This Project
Cut Off, LA
Bid Date: Jan 03 2024
Cut Off, LA
Bid Date: Feb 16 2024
Cut Off, LA
Bid Date: Feb 27 2024
Cut Off, LA
Bid Date: Apr 04 2024
Cut Off, LA
Bid Date: May 30 2024
Cut Off, LA
Bid Date: Jul 02 2024
Cut Off, LA
Bid Date: Jun 18 2024
Cut Off, LA
--
Cut Off, LA
Bid Date: Jan 07 2022
Cut Off, LA
Bid Date: Feb 07 2024
Cut Off, LA
Bid Date: Sep 06 2023
Cut Off, LA
Bid Date: Jul 06 2023
Cut Off, LA
Bid Date: Jun 06 2023
Cut Off, LA
Bid Date: Sep 19 2018
Cut Off, LA
Bid Date: Jul 28 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.