BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Newcastle, Wyoming. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 25, 2023, project was awarded to Sacrison Paving Inc awarded amount is $182,899.50 ** The Work Shall Consist of Asphalt Paving, Rotomilling, Asphalt Overlay, and Other Related Items. The Owner May Reject Any and All Bids and Reserves the Right to Waive Minor Irregularities in Any Bid. Each Bid Must Be Accompanied by Bid Security Payable to the City of Newcastle for 5% of the Total Amount of the Bid, to Be Forfeited to the Owner as Liquidated Damages if the Bidder is Awarded the Contract and Fails to Enter Into an Agreement With the Owner Within Thirty (30) Days From His Notification. All Bids Shall Remain Open for Forty-five (45) Days After the Day of the Bid Opening. The Successful Bidder Shall Perform the Work and Furnish a Performance Bond and a Payment Bond, Each in the Amount of 100% of the Contract Price With a Corporate Surety Approved by the Owner. The Contractor Shall Guarantee All Materials and Equipment Furnished and Work Performed for a Period of One Year From the Date of Final Acceptance. The Performance Bond Shall Remain in Full Force and in Effect Through the Guarantee Period. The Notice to Proceed Shall Be Issued Within Thirty (30) Days of the Execution of the Agreement by the Owner. If the Notice to Proceed is Not Issued Within This Period, This Period May Be Extended by Mutual Agreement Between the Owner and the Contractor. If the Notice to Proceed Has Not Been Issued Within the Thirty (30) Day Period or Within Any Mutually Acceptable Extension Thereof, the Contractor or the Owner May Terminate the Agreement on Written Notice to the Other Party, and in Such Case, There Shall Be No Liability Under the Agreement or Otherwise on the Part of Either Party. Contracts Will Be Awarded to the Lowest Bidder Who Has Met the Minimum Requirements Set Forth in Article 3, Instructions to Bidders, and Who is Determined to Be Responsible in the Sole Discretion of the Governing Body. Resident Wyoming Laborers, Workmen and Mechanics Shall Be Used Upon All Work in This Contract Whenever Possible. Pursuant to W.s. 16-6-106, Preference is Hereby Given to Materials, Supplies, Agricultural Products, Equipment, Machinery and Provisions Produced, Manufactured, Supplied or Grown in Wyoming, Quality Being Equal to Articles Offered by the Competitors Outside of the State.

Award

Roads / Highways

$182,899.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
8
Bidding Soon
247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2023

November 13, 2023

Project location map

Multiple Locations, Newcastle, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.